3 Commissioning
Quick User Manual
24
Fig. 3-6
Correct Power cable connection for Three-phase Meter
Action
LCD Display Explanation
Method 1:
Turn off all the household loads.
All the PV power generation
should be exported to the grid, as
shown in the “Correct” figure.
Method 2:
Stop the inverter via the LCD
menu and turn on the household
loads.
All the load power consumption
should be imported from the grid,
as shown in the “Correct” figure.
The reverse sensor connection will cause the communication fault 084.
To clear the fault 084, please turn off the DC sources and then restart the
system after reconnecting the sensor in correct direction.
3.3.2 Battery Information
After initial settings, check the detailed battery information on the LCD display.
Содержание SH3K6
Страница 1: ...SH3 6_4 6K QUEN Ver12 201710 Version 1 2 Quick User Manual SH3K6 SH4K6 Grid Connected Hybrid Inverter ...
Страница 2: ......
Страница 4: ...II System Overview ...
Страница 5: ...III ...
Страница 6: ...IV ...
Страница 7: ...V ...
Страница 8: ...VI ...
Страница 28: ...3 Commissioning Quick User Manual 18 Fig 3 2 Initial Settings ...