Installation Instructions for the
PowerFit20 Photovoltaic Modules
Страница 1: ...Installation Instructions for the PowerFit20 Photovoltaic Modules...
Страница 2: ...ed to one side of the seam and allow for a clean wiring for each module to go to the roof cap This piece will be installed with the butyl based adhesive included with the component WMS Junction Box Co...
Страница 3: ...re conduit This will allow for a more structurally sound install along with creating a water proof sealant to prevent debris from entering the WMS Other Required Components Inverters Consult your inst...
Страница 4: ...e shall not be considered to comply with the requirements of UL1703 unless the module is mounted with hardware that has been tested and evaluated with the module under this standard or by field inspec...
Страница 5: ...nd death Do not attempt to install service remove touch or modify a damaged module Damaged modules should only be removed by qualified professionals wearing appropriate personal protection equipment f...
Страница 6: ...nt electricity from being generated Do not wear metallic jewelry including ear nose and lip rings watchbands pins or any other metallic object during installation or troubleshooting of photovoltaic sy...
Страница 7: ...Management System WMS is certified as Class A over any Class A metal standing seam roofing constructions Metal Roof Manufacturer Approvals The PowerFit20 module is fully engineered to reduce stresses...
Страница 8: ...e flat space Use a rubber wheeled roller to ensure the proper pressure is applied to the module Module Installation After the roof has been cleaned to the requirements above the components can be adhe...
Страница 9: ...s that are opposite the side of the WMS wire conduit pieces Using the 7 5 MC4 jumper cables connect one end to the module located on the upward slope and run it through the WMS wire conduit towards th...
Страница 10: ...de of the junction box cover should go over and around the WMS wire conduit to ensure a watertight seal Apply pressure to the junction box cover to complete the installation Repeat this process until...
Страница 11: ...ions with the PowerFit20 modules No more than 6 modules should be connected in series to one AP Smart component Doing any more will result in failure of the PV system Figure 11 Shows the proper connec...
Страница 12: ...eplace any WMS junction box cover that is damaged or significantly degraded If a module is damaged leave it in place Do not attempt to remove the module from the roofing surface unless it poses an ele...
Страница 13: ...o any roofing products with which they may come in contact Sunflare accepts no liability for damages financial losses of any kind business interruptions or lost earnings whether they be direct or inci...