background image

The WMS spacer tube will be used to help adhere 

the junction box cover and also help guide the 

distance in between modules. Take the second 

module and line it up so that it is adjacent to 

the WMS spacer tube and in line with the first 

module installed. Once placed, remove the 

adhesive covering and apply pressure to install 

the second module. Ensure the junction boxes 

on the second modules are on the upward slope 

so that they are next to the junction boxes of the 

first module installed.

Before installing the last WMS component for the 

two modules, connect one of the 8” MC4 jumper 

cables. These should be installed on the junction 

boxes of the two modules that are opposite the 

side of the WMS wire conduit pieces. Using the 

7.5’ MC4 jumper cables connect one end to the 

module located on the upward slope and run it 

through the WMS wire conduit towards the ridge 

of the roof. Use another 7.5’ MC4 jumper cable 

to connect it to the bottom module and run it 

through the WMS wire conduit towards the eave 

of the roof. 

Take another piece of the WMS wire conduit and 

line it up so that the bottom of the component 

on the downhill slope is even with the end of the 

second module. Remove the adhesive covering 

and apply pressure to install the component.

9

Figure 4. Shows the spacer tube installed with the 

first module on the standing seam.

Figure 6. Shows the second piece of WMS wire 

conduit being installed.

Figure 5. Shows the second module installed with 

the spacer tube, first module, and first WMS wire 

conduit piece.

Содержание PowerFit20

Страница 1: ...Installation Instructions for the PowerFit20 Photovoltaic Modules...

Страница 2: ...ed to one side of the seam and allow for a clean wiring for each module to go to the roof cap This piece will be installed with the butyl based adhesive included with the component WMS Junction Box Co...

Страница 3: ...re conduit This will allow for a more structurally sound install along with creating a water proof sealant to prevent debris from entering the WMS Other Required Components Inverters Consult your inst...

Страница 4: ...e shall not be considered to comply with the requirements of UL1703 unless the module is mounted with hardware that has been tested and evaluated with the module under this standard or by field inspec...

Страница 5: ...nd death Do not attempt to install service remove touch or modify a damaged module Damaged modules should only be removed by qualified professionals wearing appropriate personal protection equipment f...

Страница 6: ...nt electricity from being generated Do not wear metallic jewelry including ear nose and lip rings watchbands pins or any other metallic object during installation or troubleshooting of photovoltaic sy...

Страница 7: ...Management System WMS is certified as Class A over any Class A metal standing seam roofing constructions Metal Roof Manufacturer Approvals The PowerFit20 module is fully engineered to reduce stresses...

Страница 8: ...e flat space Use a rubber wheeled roller to ensure the proper pressure is applied to the module Module Installation After the roof has been cleaned to the requirements above the components can be adhe...

Страница 9: ...s that are opposite the side of the WMS wire conduit pieces Using the 7 5 MC4 jumper cables connect one end to the module located on the upward slope and run it through the WMS wire conduit towards th...

Страница 10: ...de of the junction box cover should go over and around the WMS wire conduit to ensure a watertight seal Apply pressure to the junction box cover to complete the installation Repeat this process until...

Страница 11: ...ions with the PowerFit20 modules No more than 6 modules should be connected in series to one AP Smart component Doing any more will result in failure of the PV system Figure 11 Shows the proper connec...

Страница 12: ...eplace any WMS junction box cover that is damaged or significantly degraded If a module is damaged leave it in place Do not attempt to remove the module from the roofing surface unless it poses an ele...

Страница 13: ...o any roofing products with which they may come in contact Sunflare accepts no liability for damages financial losses of any kind business interruptions or lost earnings whether they be direct or inci...

Отзывы: