Chapter 4
Maintaining the Sun Fire X2100 Server
4-3
4.2.3
Postinstallation Instructions
Perform the following steps after installing a server component:
1. Ensure that all of the components are installed as described in the step-by-step
instructions.
See
Section 4.5, “Customer-Replaceable-Unit Replacement Procedures” on page 4-6
.
2. Install any PCI-Express (PCIe) cards or peripherals that you had previously
removed.
See
Section 4.5, “Customer-Replaceable-Unit Replacement Procedures” on page 4-6
.
3. Install the cover.
See
Section 4.3, “Powering Off the Server and Removing the Cover” on page 4-3
.
4. Connect all external cables to the system.
5. Power on the system.
See
Section 1.4.1, “Powering On the Server” on page 1-8
.
Caution –
If the cover and hard disk drives have been removed, do not operate the
server for more than ten minutes. Improper cooling airflow might damage the
system components.
4.3
Powering Off the Server and Removing
the Cover
1. If the operating system (OS) is running, perform a shutdown of the OS, and then
press and release the platform power button on the front panel.
2. Turn off all peripheral devices connected to the system.
3. Disconnect the AC power on the back panel of the server (see
FIGURE 1-2
).
4. Turn off the power to any attached peripherals.
5. Label and disconnect all peripheral cables and all telecommunication lines
connected to I/O connectors or ports on the back panel of the system.
Содержание Sun Fire X2100
Страница 8: ...viii Sun Fire X2100 Server User Guide April 2007...
Страница 30: ...2 8 Sun Fire X2100 Server User Guide April 2007...
Страница 104: ...A 4 Sun Fire X2100 Server User Guide April 2007...
Страница 114: ...B 10 Sun Fire X2100 Server User Guide April 2007...