(Unit : mm)
Floor cutout area for cables
Caster
Screw jack
Service clearance
G
Grid panel (over 450mm x 450mm)
601
Front
G
DKC615
a *1
B *1
195
65 125
65
835
63 90
74
61.5
457
482
601
c *1
3250
1050
1100
Front
1050.00
575
601
Rear
DKC615
125
200 or more
355
482
215
62
125
1100
Figure 2- 4
Service Clearance and Floor Cutouts: Single Rack
Notes:
Clearance (a+b) depends on the floor load rating and clearance (c). See Table 24 for floor load rating and clearance
requirements.
Leave clearance of 100 mm on both sides of the storage system when the stabilizer plate(s) are to be attached after the
storage system is installed. When storage systems of the same type are to be installed adjacent to each other, the minimum
clearance between the storage systems is 100 mm.
Dimensions in parentheses show allowable range of the floor cutout dimensions. Position the floor cutout in the center of the
storage system. The position may be offcenter if the cutout allows smooth entrance of an external cable. Check the relation
between the positions of the cutout and the opening on the bottom plate of the storage rack, and verify that it is within the
allowable range.
This dimension varies depending on the floor cutout dimensions.
Just the Facts
October 2007
161
Sun Confidential – For Internal Use and Authorized Partner Use Only
Содержание StorageTek 9985V
Страница 174: ...Just the Facts October 2007 174 Sun Confidential For Internal Use and Authorized Partner Use Only ...
Страница 175: ...I Just the Facts October 2007 175 Sun Confidential For Internal Use and Authorized Partner Use Only ...
Страница 176: ...Just the Facts October 2007 176 Sun Confidential For Internal Use and Authorized Partner Use Only ...