
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
24
SUMMIT PUMP MODEL 2175
Figure 4
2. Outboard Isolator (332A). Position the bearing cover (109A) on arbor press table.
Place the isolator in the bore and press into place using the same technique as in
Step 1
above.
3. Set covers aside for installation as detailed in Pump Assembly procedures.
MAKE SURE EXPULSION PORT AND LUBE RETURN ARE IN THE 6 O’CLOCK
POSITION IN FINAL ASSEMBLY.
Содержание 2175 L
Страница 1: ......
Страница 2: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL ii SUMMIT PUMP MODEL 2175...
Страница 6: ......
Страница 40: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 34 SUMMIT PUMP MODEL 2175 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 41: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL SUMMIT PUMP MODEL 2175 35 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 42: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL 36 SUMMIT PUMP MODEL 2175 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL SUMMIT PUMP MODEL 2175...