SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM
4. PLANNING AND INSTALLATION INSTRUCTIONS
Attentions:
The shower has to be installed, rinsed and checked in compliance with the applicable regulations in order
to guarantee proper shower function!
The dimensions of the shower set-up must be individually.
Operating pressure at the control valve:
Max. 1Mpa. Recommended operating pressure: 3 bar pressure.
Hot water temperature: Max 60 degree centigrade (140 Fahrenheit).
5. Rough-in Valve Installation
5.1
Make a mounting rack (normally use woods as materials) for preparing install the rough-in valve assembly .the mounting board’s
face should be Min1-25/32’’ and Max 2-3/4" behind the finish wall surface.