SUMERAIN SANITARY GROUP WWW.SUMERAIN.COM
5.4.7
Rough-in valve installed finished.
6. VALVE TRIM INSTALLATION
6.1
Remove the plaster guard cover and check all connection for leaks. Please recover the plaster guard cover after leaking test.
Please shut off your hot and cold water supply again if no leaking.