CYBERHANDLER 2 INSTALLATION, OPERATION AND MAINTENANCE MANUAL
EN/05.2019 © STULZ GmbH – all rights reserved
19
Several modules joined together can be transported together only fixing the lifting
gear to all the lifting lugs of the baseframe.
• Intermediate baseframe:
• The intermediate baseframe (if existing) of the double deck units must be fixed to the alumin-
ium profiles of the lower modules with screws.
• Roof (units for outdoor installation):
• Place a rivet in each drilled hole and secure it with a rivet gun
Fig 6-10: Assembly of intermediate baseframe
Fig. 6-11: Assembly of roof
Rivet
Module 2
Module 1
Lower module
Upper module
Screw
Intermediate
baseframe