![Stuart Turner Monsoon U1.5 bar Twin Скачать руководство пользователя страница 16](http://html1.mh-extra.com/html/stuart-turner/monsoon-u1-5-bar-twin/monsoon-u1-5-bar-twin_installation-instructions-manual_1386378016.webp)
- 16 -
5.
The pressure vessel air pre-charge does not require routine maintenance. Should
ever the need arise for the vessel to have its air pre-charge checked or replenished, it
should be carried out as follows: -
a)
Isolate pump electrically.
b)
Isolate hot and cold water supplies via the integral pump isolating valve located in
the flexible hoses (see pump connections section).
c)
Release system water pressure by opening a system outlet (tap).
d)
Check air pre-charge at Schrader valve (Fig. 16) using a tyre pressure gauge.
Cont....
Fig. 15
M4 screws
Manifold clamp
Strainer
Inlet fitting
‘O’-ring
Location detail
Inlet port
Model
Vessel Pressure
kPa
bar
psi
U1.5 bar Twin
90
0.9
13.0
U2.0 bar Twin
U3.0 bar Twin
U4.0 bar Twin
130
1.3
18.5
U4.5 bar Twin