5 COMMISSIONING / STARTING
6.11
System Flushing
The pipework system should be flushed out prior to the iBoost
being connected to ensure any contaminants/chemical residues
and foreign bodies are removed from elsewhere in the system.
Fill the system and check for leaks, refer back to the iBoost 200
manual for priming and starting of the pump.
6.12
Water Supply:
Always ensure that water supply is adequate to meet the
demand.
6.13
For Further Technical Support:
Phone the Stuart Turner PumpAssist team
on +44 (0) 800 31 969 80. Our staff are trained to help and advise you over the
phone.