
- 12 -
Cont ...
c) Run the mains water and overflow to the template positions and make the
pipe length as detailed in Fig. 14).
d) Slide the 200 in front of the services leaving approximately 20 mm
gap between the iBoost and the wall behind. Connect the services using
isolation valves and demountable fittings (push-fit or compression) were
shown in Fig. 15. The positioning of these fittings allow the iBoost to be
removed without cutting pipes or draining the system.
Fig. 14
Mains water supply
Pumped water supply
(connection only for iBoost 200)
Overflow
Isolating valve
Non-pumped water supply
B
A
Length of pipework from wall*
mm
A
Overflow
490
B
Mains water supply
500
*Lengths are dependent on fittings used
Fig. 15
Overflow
Non-pumped
water supply
Mains water
supply
Pumped water supply
(connection only for
iBoost 200)
Demountable
fittings