![Stuart Turner 47359 Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/stuart-turner/47359/47359_installation-operation-and-maintenance-instructions-manual_1386366024.webp)
22
9.5
System Flushing
•
The pipework system should be flushed out prior to the iMatic
being connected to ensure any contaminants/chemical residues
and foreign bodies are removed from elsewhere in the system.
9.6
Water Supply
Always ensure that water supply is adequate to meet the demand. Ensure the
pump chamber is full of water before starting the pump. Failure to do this could
result in seal damage. To ensure dry running does not occur the pump must be
primed as described in priming section below.
Do not run pump dry
.