R
ESERVE
P
ACKING
I
NSTRUCTIONS
Please read these instructions fully to gain a thorough understanding of the Quasar II and its
components before starting to pack. If the rig is to be fitted with an AAD, refer to page 12 of this
manual for detailed installation instructions before continuing.
R
IGGER
Q
UALIFICATIONS
FAR Part 105.43 (2) states that only a certificated and appropriately rated senior or master
parachute rigger may pack a reserve parachute that will be carried for use aboard an aircraft in the
U.S. By following the instructions in this manual, any current, appropriately rated rigger should be
able to assemble and pack the Quasar II reserve.
R
EQUIRED
T
OOLS
1 ea. temporary locking pin
1 ea. 60” pull up cord
1 ea. packing paddle
2 ea. 1.5” x 6” pile Velcro® (Ram Air Reserve Only)
R
OUND
R
ESERVE
Note:
Only round reserves with a full stow diaper may be packed into the Quasar II. No provisions
are provided for stowing the lines in the container.
Follow the packing instructions provided by the manufacturer of the particular canopy you are
installing for assembly, flaking, and line stowage.
A
SSEMBLY
1. Attach the 40" reserve bridle to the pilot
chute with a lark’s head knot that passes
through all three of the pilot chute's dacron
line loops.
2. Attach the bridle to the canopy’s apex
with a lark’s head knot as well.
13
Quasar II Owners Manual Rev.C 11/2000
Strong Enterprises