17
Key
1 Turbotec wood gas boiler
2 Load compensation storage
tank, buffer storage tank or
energy storage tank
3 Heating distributor
4 Tap water storage tank
5 Oil or gas-fired boiler
6 Hydraulic unit
Y1
Return valve with actuator
Y2
Charging valve with actuator
Y3
Four-way valve with actuator
Y4
Non-return valve or flap
Z5
Non-return valve or flap
SS
Storage tank sensor
(lambda control)
P1 Primary pump
P2 Heating circuit pump
P3 Charging pump, tap water
storage tank
Position Y2:
Storage tank bypassed (0)
Storage tank switched in (1)
Important instruction:
Stop valves, vents and technical safety measures are not shown on this block diagram. These must be installed
system-specifically in accordance with standards and regulations. In the case of operation with one flue, an
approved exhaust fume temperature monitor (DIN 3440) must be fitted to the Turbotec and switches mounted on
the doors and in the control chain of the oil and gas-fired boiler.
The electrical installation of the boiler system, including all control and safety devices, may only be performed by a
qualified electrician. The relevant national regulations (Germany: VDE DIN 57116 Electrical Equipment of
Combustion Plants; Austria: ÖVE 0116) and the Technical Connection Conditions) of the electricity supply
company must be complied with.
Содержание 40S-70
Страница 27: ...23 Commissioning Circuit diagram ...
Страница 29: ...24 Commissioning Short operating instructions ...
Страница 31: ......
Страница 35: ...28 Notes ...
Страница 38: ......