background image

Electronic Interference, Immunity, Safety, and Noise Level Standards Compliance

C-4     

Stratus ftServer V 2302, V 4304, and V 6308 Systems: Site Planning Guide

 (R624)

 

Energy Star Note

As defined by the EPA ENERGYSTAR Program Requirements for Computer Servers, 
Tier 1 requirements, this server is defined as a “Fully Fault Tolerant Server.” Presently 
there are no defined requirements, and this category of servers is ineligible to receive 
an Energy Star rating. As such there are no sales restrictions for local or federal 
agencies.

Korean User Information

Содержание ftServer V 2302

Страница 1: ...Stratus Technologies R624 04 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide ...

Страница 2: ... for use by Stratus personnel and are subject to change without warning This document is protected by copyright All rights are reserved Stratus Technologies grants you limited permission to download and print a reasonable number of copies of this document or any portions thereof without change for your internal use only provided you retain all copyright notices and other restrictive legends and or...

Страница 3: ...tion 1 9 Safety Notices 1 10 Consignes de sécurité 1 13 2 AC Power Planning 2 1 AC Power Overview 2 1 Redundant Power Sources 2 1 AC Power and HVAC Worksheets 2 2 Selecting a UPS Unit for ftServer Systems 2 4 AC Power Connections to Qualified UPS Models 2 4 Power Cord Summary 2 6 Main Cabinet Ground Cables 2 6 3 Space and Component Location Planning 3 1 RSN Connections 3 1 Fibre Channel Connection...

Страница 4: ...ions 5 1 Cabinet Configurations 5 1 Appendix A System Specifications A 1 System Specifications A 1 AAP87600V PDU Specifications A 6 Appendix B Electrical Circuit and Wiring Information B 1 Fault Protection Requirements B 1 Grounding Considerations B 1 Circuit Wiring Diagrams B 2 Electrical Power Connectors B 8 Appendix C Standards Compliance C 1 Electronic Interference Immunity Safety and Noise Le...

Страница 5: ...tServer V 2302 System Without Network I O Enclosure 5 4 Figure A 1 CPU I O Enclosures Front View A 2 Figure A 2 ftServer CPU I O Enclosures Rear View A 2 Figure A 3 AAP87600V PDU A 6 Figure B 1 Star Ground Example B 2 Figure B 2 Power Input Labeling B 3 Figure B 3 Single Phase 120V AC Circuit Connection B 3 Figure B 4 Single Phase 240V AC Circuit Connection B 4 Figure B 5 Split Phase 120 240 Volts...

Страница 6: ... to PDU AC Power Cords for Qualified UPS Models 2 5 Table 2 4 Power Cords 2 6 Table 2 5 Main Cabinet Ground Cable 2 6 Table 3 1 Cord and Cable Summary 3 3 Table 3 2 Location of V Series System Components 3 4 Table 4 1 Ethernet Subnet Requirements 4 3 Table A 1 Cabinet Dimensions A 3 Table A 2 V 2302 V 4304 and V 6308 System CPU I O Enclosure Specifications A 4 Table A 3 AAP87600V PDU Specification...

Страница 7: ... ftServer V 2302 V 4304 and V 6308 systems on a qualified release of OpenVOS Release 18 0 x N O T E Contact your account representative for information about which specific release of OpenVOS Release 18 0 x supports ftScalable Storage G2 systems Notation Conventions This document uses the notation conventions described in this section Warnings Cautions and Notes Warnings cautions and notes provide...

Страница 8: ...software try these online resources first Online documentation at the StrataDOC Web site Stratus provides complimentary access to StrataDOC an online documentation service that enables you to view search download and print customer documentation You can access StrataDOC at the following Web site http stratadoc stratus com Online support from Stratus Customer Service You can find the latest technic...

Страница 9: ...ustomer Service team will be glad to assist you Commenting on This Manual You can comment on this manual using one of the following methods When you submit a comment be sure to provide the manual s name and part number a description of the problem and the location in the manual where the affected text appears From StrataDOC click the site feedback link at the bottom of any page In the pop up windo...

Страница 10: ...Preface x Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...

Страница 11: ...9 Safety Notices on page 1 10 Site Planning Overview Site planning for fault tolerant systems includes Electrical power planning Provide electrical power sources that meet the requirements of the system and optional components including the purchase of a qualified uninterruptible power supply UPS Space planning Plan the location of the system and external components to accommodate the lengths of t...

Страница 12: ...ve a contract with the CAC or your authorized Stratus service representative to install the system contact them after you have prepared the installation site and moved the system to the site For more information about the CAC see the http www stratus com support cac Web site See Chapter 5 Supported Configurations for illustrations of the rack configurations of your ftServer system and other rack m...

Страница 13: ...om the top of the cabinet and are routed along the ceiling At sites with raised floors the cables exit from the bottom rear of the cabinet and are routed under the floor To accommodate cables from your system make sure to provide One or two telephone lines as described in Telephone Lines on page 4 1 Ethernet ports switches or hubs as needed Two UPS units within reach of the power cords from the sy...

Страница 14: ...1 1 shows cabling considerations for systems using the AA E97900 RSN console server to connect to the Internet Figure 1 1 AA E97900 RSN Console Server Connections Internet Overhead cable tray Cable ladder Ethernet Future expansion System PC console vos237a RSN console server Ethernet Serial Serial UPS units ...

Страница 15: ...ne and telephone line near the operator s station for voice communications when calling for support Planning for RSN Connectivity If using the AA E97900 console server to connect to the Internet do you have an Ethernet connection to the Internet and do you have OpenVOS Release 17 1 0 or later installed If using the AA E97900 console server to connect to a modem do you have an external telephone li...

Страница 16: ... installation site Plan to keep the console located with the system To plan for storage enclosures in your system see the Stratus ftServer Systems Peripherals Site Planning Guide R582 for descriptions of the enclosures and the names of the required PCI adapters Planning AC Power Have you selected and purchased two UPS units for each ftServer system What optional components will you use What are th...

Страница 17: ...s Have you provided your facilities group and contractors with the sketch of how you plan to arrange the system and copies of the following Redundant Power Sources on page 3 1 Appendix B Electrical Circuit and Wiring Information Any notes you have about site planning Have you reviewed and discussed the requirements with the facilities personnel and contractors to ensure that all site modifications...

Страница 18: ... the CAC Check the Tip N Tell and Shockwatch motion sensors to determine if they have been activated If a sensor has been activated or if there is any damage report it immediately to the carrier and to the CAC Check the packing list If you received the wrong shipment or if the shipment is incomplete report it immediately to the carrier and to the CAC Moving the System to the Installation Site Befo...

Страница 19: ...h document Table 1 2 ftServer V 2302 V 4304 and V 6308 System Documentation Document Task Stratus ftServer Systems PCI Adapter Guide R461 Install configure replace or troubleshoot PCI adapters Stratus ftServer Systems Peripherals Site Planning Guide R582 Find information about optional equipment that you have ordered with your system that is needed to complete site preparation Stratus ftServer V 2...

Страница 20: ...educe the risk that electrical shock could injure a person or damage the system exercise caution when working in the unit even when only one power cord is connected W A R N I N G To prevent a cabinet from tipping over and injuring a person or damaging the system start installing systems from the bottom of the cabinet upward W A R N I N G If you replace the modem cable supplied by Stratus use a cab...

Страница 21: ... a fire W A R N I N G Disconnect the power cords from the server or power source before you install or relocate the equipment All voltage is removed only when the power cords are disconnected W A R N I N G Do not install or store the equipment in an unsuitable place Install or store the equipment in a place that meets the requirements specified in this guide Avoid the following conditions to avoid...

Страница 22: ...es or conductive particles in the air Such environments may cause corrosion or short circuits within this product resulting in not only damage to this product but also fire If there are any concerns regarding the environment at the planned site of installation or storage please contact your CAC W A R N I N G When installing a system or CRU always connect the power cord first before adding communic...

Страница 23: ...ardware or a fire W A R N I N G Do not leave the DVD tray ejected Dust may enter the equipment and cause it to malfunction The ejected tray may also become a cause of injuries Consignes de sécurité A V E R T I S S E M E N T Risque d explosion si la batterie est remplacée par une autre de type incorrect Jeter les batteries usagées conformément aux instructions fournies avec la batterie A V E R T I ...

Страница 24: ...er d eau ou d objets étrangers tels que des agrafes ou des trombones entrer dans l équipement A V E R T I S S E M E N T Pour éviter tout risque d incendie ou de fuite de courant ne pas brancher le cordon d alimentation dans une prise non conforme Utiliser une prise de courant avec une tension et un type d alimentation appropriés tel qu indiqué dans ce guide A V E R T I S S E M E N T Ne pas install...

Страница 25: ...roduit dans un environnement qui pourrait contenir des gaz corrosifs Ces gaz incluent mais sans s y limiter du dioxyde de soufre du sulfure d hydrogène du dioxyde d azote du chlore de l ammoniac ou de l ozone Éviter d installer ce produit dans un environnement poussiéreux ou qui pourrait contenir des matériaux corrosifs tels que du chlorure de sodium ou du soufre Éviter d installer ce produit dans...

Страница 26: ...tation à une CRU lorsqu elle n est pas à l intérieur du châssis du système A V E R T I S S E M E N T Ne pas démonter réparer ou modifier le serveur sauf conformément à ce qui est décrit dans le Stratus ftServer V 2302 V 4304 and V 6308 Systems Operation and Maintenance Guide R625 Il existe un risque de choc électrique ou d incendie ainsi que de défaillance de l équipement si vous ne respectez pas ...

Страница 27: ...Consignes de sécurité Site Planning for ftServer V 2302 V 4304 and V 6308 Systems 1 17 W A R N I N G W A R N I N G W A R N I N G W A R N I N G W A R N I N G ...

Страница 28: ...Consignes de sécurité 1 18 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 W A R N I N G W A R N I N G W A R N I N G W A R N I N G ...

Страница 29: ...Consignes de sécurité Site Planning for ftServer V 2302 V 4304 and V 6308 Systems 1 19 W A R N I N G W A R N I N G W A R N I N G ...

Страница 30: ...Consignes de sécurité 1 20 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 W A R N I N G W A R N I N G ...

Страница 31: ... distribute power to the system s components Legacy E124 expansion storage system cabinets also require two separate and independent AC power sources each fed by two UPS units You can use one of the UPS models that Stratus has qualified See Selecting a UPS Unit for ftServer Systems on page 2 4 for more information You must also provide AC power to the system PC console RSN console server and RSN m...

Страница 32: ... the following components The B side CPU I O enclosure The B side of the optional network I O enclosure Tape drive enclosures if present One side of each disk storage enclosure that is installed in the system cabinet The B sides of the supported Ethernet and FC switches AC Power and HVAC Worksheets When planning for the system s electrical needs consider the following The AC power service required...

Страница 33: ...ntry in the Watts Subtotal column by 3 41 and enter the number of BTUs in the BTUs hr Subtotal column Determine the total number of BTUs per hour by adding the values in the BTUs hr Subtotal column Table 2 1 Worksheet for Planning Site AC Outlets and Cord Lengths Product Purchased Quantity of Product No of AC Outlets Required Subtotal of AC Outlets Type of Plug AC Cord Lengths ftServer V 2302 V 43...

Страница 34: ...ur UPS vendor for more information AC Power Connections to Qualified UPS Models AC input power cords must be hardwired to the qualified UPS models Table 2 3 lists how the PDU AC input power cords connect to the qualified UPS models Table 2 2 Work Sheet for Site AC Power and HVAC Requirements Product Purchased Quantity Watts Watts Subtotal Convert to BTUs BTUs hr Subtotal ftServer V 2302 systems x ...

Страница 35: ...into L6 20R receptacles on the A side and B side UPS units respectively Chloride LT081XIT 0E3KX Use two B52700 45V power cords for the A side and B side PDU AC input cords These cords plug into the IEC C19 receptacles on the A side and B side UPS units respectively Chloride LT081XJT 0H0SX The A side and B side PDU AC input cords plug into L6 20R receptacles on the A side and B side UPS units respe...

Страница 36: ...on about the main cabinet ground cable Table 2 4 Power Cords Component Power Cord UPS model qualified by Stratus 220 VAC input Customer supplied hardwired to UPS AC input terminals 220 VAC output See AC Power Connections to Qualified UPS Models on page 2 4 PDU See AAP87600V PDU Specifications on page A 6 Legacy E124 storage system cabinet AC source to power strips in the cabinet See the Stratus ft...

Страница 37: ...ge 3 9 RSN Connections ftServer V Series modules require a connection to the Remote Service Network RSN which allows the CAC to remotely diagnose troubleshoot and resolve problems online The connection to the RSN is implemented through an RSN bridge module which is a module that is physically connected to the Internet or a modem a dialup connection The RSN bridge module provides connectivity to th...

Страница 38: ...er V 2302 systems connect to ftScalable Storage RAID controller trays directly through U534V Dual Port Optical Fibre Channel PCI Adapters Optional tape drives connect directly to the U534V Dual Port Optical Fibre Channel PCI Adapters ftServer V 2302 systems support a single tape drive ftServer V 4304 and V 6308 systems support both single or dual tape drives For connections to ftScalable Storage R...

Страница 39: ...d or Cable Type and Number Source Description AA E97900 RSN console server With an AA C72100 modem Ethernet cable 1 Stratus RSN console to system 20 ft 6 10m Serial cable 1 Stratus RSN console to system 25 ft 7 62m Serial cable 1 Stratus RSN console to modem 6 ft 1 83m AA C72100 modem Telephone cord 1 Customer Modem RJ 11 to service jack Ensure that cord is long enough to reach telephone service j...

Страница 40: ...requirements Optional U760 Eight Port Serial Synchronous PICMG 2 16 Adapter in optional NIO enclosure RS 232C RS 449 or V 35 Stratus Optional NIO enclosure to network connection 12ft 3 65m Table 3 2 Location of V Series System Components Page 1 of 2 Component Location of Component External Component Location AA E97900 RSN console server Free standing outside the system cabinet Place within 9 feet ...

Страница 41: ... and humidity levels and has a thermometer and humidistat to monitor room temperature and humidity See Chapter 2 AC Power Planning for detailed information about HVAC planning and Appendix A System Specifications for detailed information on temperature and humidity requirements Is as free as possible of airborne contamination particulate and gaseous Optional U760 Eight Port Serial Synchronous PICM...

Страница 42: ...ation gazeuse comme les gaz chlorés ou sulfurifères doit adhérer à la norme ANSI ISA 71 04 1985 avec un niveau de sévérité G1 Dust buildup in the system can impede air circulation and heat transfer causing components to become less reliable as the ambient temperature rises Fans clogged by dust fail to expel hot air causing circuit boards to overheat and fail Dust on circuit boards raises the tempe...

Страница 43: ...or external components that do not connect to a PDU Provides cutouts in the floor for routing cables if the site has an elevated floor Contains space for future expansion N O T I C E Do not place the system in an area of high electrostatic discharge Static electricity may damage components Do not locate components near transformers or other electromagnetic devices See Appendix A System Specificati...

Страница 44: ... main cabinet has cabinet leveling feet Anti tip brackets are optional The cabinet leveling feet and the anti tip brackets rest on top of the floor so you do not need to drill holes in the floor Future expansion vos120c Service area Service area Flat surface for RSN console server and modem if present System PC console Service area Ceiling clearance 20 in 50 8 cm Service area UPS units ...

Страница 45: ...Locations and types of AC power outlets Lengths and routes of power cords Locations of phone jacks Ethernet jacks switches and or hubs Lengths and routes of telephone and other communications and interface cables C A U T I O N Make sure that all cords and cables are long enough to reach between their respective components and connectors Route all cables out of the way of foot traffic Figure 3 2 co...

Страница 46: ...ndicates the access area required for servicing 0 1 2 3 ft 0 5 1 m ftServer system main cabinet and storage system cabinets System PC Table Chair 3 ft 92m x 4 ft 1 22m Table 3 ft 92m x 3 ft 92m Chair console Door space Door space Door space Door space Door space Door space Door space Door space RSN modem RSN console server RSN console server modem connection Internet connection ...

Страница 47: ...Creating a Floor Plan Space and Component Location Planning 3 11 Figure 3 3 Site Layout Grid 1 square foot ...

Страница 48: ...Creating a Floor Plan 3 12 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...

Страница 49: ...system When using the AA E97900 RSN console server with an RSN modem you must supply an additional telephone line to connect to the modem You must supply a sufficiently long telephone cable that has an RJ 11 connector on the end that connects to the modem N O T E To provide the most reliable service for RSN connections use a dedicated phone line for the modem RSN calls routed through a PBX might b...

Страница 50: ...e acheminés en dehors du passage Site Ethernet Networks on page 4 2 Ethernet Subnet Requirements on page 4 3 Maintenance Network on page 4 3 Site Ethernet Networks For connections to one or more optional Ethernet site networks you must provide the following site Ethernet ports hubs or switches Ethernet cables You connect a site network to the ftServer system using any available Ethernet ports in t...

Страница 51: ...es RSN console server UPS units system PC console Stratus creates this network when installing the system and supplies the cables for it except for the UPS Ethernet cables which are customer supplied Table 4 1 Ethernet Subnet Requirements System Configuration Separate Class C Ethernet Subnets ftServer system with an optional network I O enclosure One subnet in the form 10 10 1 X to connect the hos...

Страница 52: ...rate as the system PC console The Microsoft Windows 7 Windows XP or Windows Vista operating system freshly installed A serial port or USB to serial port converter TinyTERM terminal emulation software installed Stratus provides this terminal emulation software Optionally you can provide your own Ethernet cable if the provided six foot Ethernet cable is not long enough for your site see Table 3 1 Se...

Страница 53: ...urations5 This chapter contains information about supported cabinet configurations Cabinet Configurations Figures 5 1 through 5 3 show the supported ftServer system cabinet configurations The illustrations show the locations of components and filler panels ...

Страница 54: ...gure 5 1 also illustrates the locations of first generation ftScalable Storage systems ftScalable Storage G2 systems reside in the same locations Figure 5 1 Base ftServer V 4304 or V 6308 System vos224 ftServer V400 S Y S T E M ftServer V400 S Y S T E M CPU I O enclosures Filler panels DVD enclosure Fibre Channel switches Filler panels Filler panels Filler panels Filler panels ftScalable storage c...

Страница 55: ...tion ftScalable Storage systems ftScalable Storage G2 systems reside in the same locations Figure 5 2 Fully Configured ftServer V 4304 or V 6308 System vos225 ftServer V400 S Y S T E M ftServer V400 S Y S T E M CPU I O enclosures Filler panels Tape drive enclosure Fibre Channel switches Filler panels DVD enclosure ftScalable storage controller tray Ethernet switches ftScalable storage expansion tr...

Страница 56: ...cabinet Figure 5 3 also illustrates the locations of first generation ftScalable Storage systems ftScalable Storage G2 systems reside in the same locations Figure 5 3 ftServer V 2302 System Without Network I O Enclosure ftServer V400 S Y S T E M vos226 Tape drive enclosure Filler panel Filler panel Ethernet switches ftScalable storage controller tray ftServer CPU I O enclosures ftScalable storage ...

Страница 57: ...s show front and rear views of the systems Figure A 1 shows the front of a CPU I O enclosure pair in an ftServer system cabinet with its bezel pulled forward Figure A 2 shows the rear of a CPU I O enclosure pair in an ftServer system cabinet specifying the locations of the connectors at the rear of the system Table A 1 lists the dimensions of the system cabinets Table A 2 lists the specifications ...

Страница 58: ... Planning Guide R624 Figure A 1 CPU I O Enclosures Front View Figure A 2 ftServer CPU I O Enclosures Rear View 1 PCI slot 3 5 USB ports 3 2 PCI slot 2 6 Serial COM ports 2 3 PCI slot 1 7 Power receptacles 2 4 Embedded 10 100 1000 Mbps Ethernet ports 4 asys009 asys011c 6 5 4 3 1 2 7 ...

Страница 59: ...n 1 04m Depth 53 in 1 35m 24U Cabinet Height including casters 50 in 1 27m Width 27 5 in 70 cm Depth 41 in 1 04m Weight empty 275 lb 125 kg Weight empty with pallet and shipping container 436 lb 197 8 kg Weight capacity 1500 lb 559 9 kg 38U Cabinet Height including casters 74 in 1 9m Width 27 5 in 70 cm Depth 41 in 1 04m Weight empty 344 lb 156 kg Weight empty with pallet and shipping container 51...

Страница 60: ...ng screws and bezel Weight including 6 DIMMS 4 processors Two enclosures 101 lb 45 8 kg fully loaded Rails and shelf unit 13 8 lb 6 26 kg Environmental Operating temperature 41 F to 95 F 5 C to 35 C For every 800 ft 243 8 m above 2000 ft 609 6 m lower the maximum operating temperature by 1 C Storage temperature 38 F to 140 F 40 C to 60 C vented Operating altitude 0 ft to 10 000 ft 0m to 3 048m Max...

Страница 61: ... DIMM slots in each CPU I O enclosure Ports Two 10 100 1000 Mbps Ethernet ports in each CPU I O enclosure Two AC power connectors and two serial ports PCI slots One of the following Two full height capable PCI X 64 bit 100MHz slots and one low profile PCI X 64 bit 133MHz slot Two full height capable slots one PCI Express x4 connector 2 5Gbps slot and one PCI X 64 bit 133MHz slot and one low profil...

Страница 62: ...4304 and V 6308 Systems Site Planning Guide R624 AAP87600V PDU Specifications The AAP87600V PDU shown in Figure A 3 supplies power to ftServer systems and optional rack mountable components Figure A 3 AAP87600V PDU 1 Power switch 2 Power receptacle ssys108a 2 1 ...

Страница 63: ... 48 51 cm Depth 6 75 in 17 15 cm Environmental Operating temperature during operation 41 F to 95 F 5 C to 35 C For every 800 ft 243 8m above 2000 ft 609 6m lower the maximum operating temperature 95 F 35 C by 1 8 F 1 C Maximum rate of temperature change during operation 12 C per hour or 0 2 C per minute Relative humidity during operation 10 to 80 noncondensing Storage temperature to 40 000 ft 12 2...

Страница 64: ...AAP87600V PDU Specifications A 8 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...

Страница 65: ... PDUs Grounding Considerations The system obtains an earth reference ground through the power cords attached to the system Similarly each peripheral device connected to the system obtains ground through its power cord For each peripheral device you must ensure that a high integrity safety ground conductor is installed as part of the wiring system in accordance with U S national electric code NFPA ...

Страница 66: ...how the hot ground and or neutral AC signals should be connected to the power input plugs of the system and optional components Figure B 3 illustrates a single phase 120V AC circuit connection Figure B 4 illustrates a single phase 240V AC circuit connection Figure B 5 illustrates a split phase 120 240V AC circuit connection Figure B 6 illustrates a three phase 208V AC Y or source circuit connectio...

Страница 67: ...lications both X and Y can be electrically hot with respect to the system base earth reference ground Figure B 2 shows the physical locations of the X and Y inputs on the system base Figure B 2 Power Input Labeling Figure B 3 shows a single phase 120V AC circuit connection Note that this application requires a single pole circuit breaker Figure B 3 Single Phase 120V AC Circuit Connection Power inp...

Страница 68: ...624 Figure B 4 shows a single phase 240V AC circuit connection Note that this application requires a single pole circuit breaker Figure B 4 Single Phase 240V AC Circuit Connection Circuit A or B X Y G PE To power input A or B Wall Power Cord L N G PE 0V Single system 20A maximum 240V PDU 20A maximum ...

Страница 69: ...phase 120 240V AC circuit connection Note that this application requires a double pole circuit breaker Figure B 5 Split Phase 120 240 Volts AC Circuit Connection Circuit A or B X Y G PE To power input A or B Wall Power Cord L1 L2 N G PE 240V 120V 0V 120V Single system 20A maximum PDU 20A maximum ...

Страница 70: ... source connection Note that the X and Y inputs on the system can be connected from L1 and L2 L2 and L3 or L1 and L3 This application requires a double pole circuit breaker Figure B 6 Three Phase 208V AC Y or D Source Circuit Connection Phase to Phase Circuit A or B 120V X Y G PE To power input A or B Wall Power Cord L1 L2 L3 N G PE 208V 208V 120V 0V 120V Single system 20A maximum PDU 20A maximum ...

Страница 71: ...l source connection Note that the system s X input can be connected to L1 L2 or L3 This application requires a single pole circuit breaker Figure B 7 Three Phase 380V AC Y or D Source Circuit Connection Phase to Neutral Circuit A or B 220V X Y G PE To power input A or B Wall Power Cord L1 L2 L3 N G PE 220V 380V 380V 220V 0V Single system 20A maximum PDU 20A maximum ...

Страница 72: ...al Power Connectors Table B 1 describes the connectors required by the AC power cords that Stratus supplies with ftServer systems Table B 1 Connectors for AC Power Outlets Connector Configuration Rating Description NEMA L6 20 20A 250 volts AC 2 pole 3 wire IEC 60309 formerly IEC 309 16 20A 250 volts AC 2 pole 3 wire ...

Страница 73: ... certification 2 You must install all wiring including power and communications cables in compliance with local and national electrical code in the United States national electrical code NFPA 70 In addition you must use shielded communications cables to remain in compliance with Federal Communications Commission FCC and other international Electromagnetic compatibility EMC regulations 3 All EMC em...

Страница 74: ...methods of measurement European Union EN 61000 3 2 Electromagnetic compatibility EMC Part 3 2 Limits Limits for harmonic current emissions equipment input current 16 A per phase European Union EN 61000 3 3 Electromagnetic compatibility EMC Part 3 3 Limits Limitation of voltage changes voltage fluctuations and flicker in public low voltage supply systems for equipment with rated current 16 A per ph...

Страница 75: ...ico BSMI Class A Information Technology Equipment Radio Disturbance Characteristics Taiwan VCCI Class A Voluntary Control Council for Interference by Information Technology Equipment Japan SABS IEC 60950 Safety of Information Technology Equipment South Africa CISP22 Class A Certificate of Compliance with the Radio Regulations South Africa KC Class A Information and Communication Equipment EMC Safe...

Страница 76: ...Note As defined by the EPA ENERGYSTAR Program Requirements for Computer Servers Tier 1 requirements this server is defined as a Fully Fault Tolerant Server Presently there are no defined requirements and this category of servers is ineligible to receive an Energy Star rating As such there are no sales restrictions for local or federal agencies Korean User Information ...

Страница 77: ...estriction of Hazardous Substances Directive RoHS based upon the exception for lead used in servers C A U T I O N The lithium battery contains perchlorate material Special handling may apply See www dtsc ca gov hazardouswaste perchlorate M I S E E N G A R D E La batterie au lithium contient des matières au perchlorate Une manipulation spécifique peut s appliquer Voir le site www dtsc ca gov hazard...

Страница 78: ...Toxic and Hazardous Substances and Elements Disclosure C 6 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...

Страница 79: ...ance Center See CAC E earth reference ground B 1 electrical connectors B 8 electrical grounding B 1 electrical wiring B 1 environmental requirements maximum rate of temperature change A 4 operating humidity A 4 storage humidity A 4 Ethernet subnet requirements 4 3 F fault tolerant systems site planning 1 2 Fibre Channel connections 3 2 floor plan 3 9 ftScalable Storage systems Fibre Channel connec...

Страница 80: ...hecklist 1 2 overview 1 1 space planning cables 1 3 future expansion 3 7 room requirements 3 5 specifications AC power cords 2 6 AP87600 PDUs A 7 cabinet A 3 CPU I O enclosure A 4 split phase circuit connections 120 240 V AC B 5 standards compliance C 1 star ground B 2 Stratus Customer Assistance Center See CAC supported configurations ftServer systems 5 1 switches site network 1 3 system PC conso...