![Stratus ftServer V 2302 Скачать руководство пользователя страница 43](http://html1.mh-extra.com/html/stratus/ftserver-v-2302/ftserver-v-2302_site-planning-manual_1383770043.webp)
Room Requirements
Space and Component Location Planning
3-7
Allows the system and peripheral devices to be placed within the room so that
power cords and communications cables will reach their respective power
receptacles, telephone jacks, and other connection points.
Provides communications cable connectors or patch panels as needed.
Provides two electrically separate grounded AC circuits to connect to the UPS units
Provides grounded AC wall outlets for external components that do not connect to
a PDU.
Provides cutouts in the floor for routing cables, if the site has an elevated floor.
Contains space for future expansion.
N O T I C E
Do not place the system in an area of high electrostatic
discharge. Static electricity may damage components.
Do not locate components near transformers or other
electromagnetic devices.
See
Appendix A, “System Specifications”
Stratus ftServer Systems: Peripherals
Site Planning Guide
(R582) for the dimensions of system components.
illustrates the space-planning considerations. You must provide a flat
surface for the RSN console server and the RSN modem (if present).
Содержание ftServer V 2302
Страница 1: ...Stratus Technologies R624 04 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide ...
Страница 10: ...Preface x Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...
Страница 47: ...Creating a Floor Plan Space and Component Location Planning 3 11 Figure 3 3 Site Layout Grid 1 square foot ...
Страница 48: ...Creating a Floor Plan 3 12 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...
Страница 64: ...AAP87600V PDU Specifications A 8 Stratus ftServer V 2302 V 4304 and V 6308 Systems Site Planning Guide R624 ...