Power receptacles, site, 2–1
Power system survey, 2–3
Powering up, cabinet, 3–9
R
Ramps
inspection, 3–3
unloading, 3–3
Removal, cabinet from pallet, 3–3
S
SCSI–2 cable lengths
in SH043 controller/storage cabinets, 5–5
SCSI–2 cable routing
in SH043 controller/storage cabinets, 5–5
in SH043 storage-only cabinets, 4–4
SCSI–2 configurations, standard
in SH043 controller/storage cabinets, 5–5
SH043 controller/storage cabinets
cable routing, general, in, 5–6
configuration of, 5–1
host SCSI–2 signal cable routing in, 5–4
power configuration of, 5–4
SCSI–2 cable lengths in, 5–5
SCSI–2 cable routing in, 5–5
shelf locations in, 5–1, 5–3
standard SCSI–2 configurations in, 5–5
TZLX-series tape drive locations in, 5–3
SH043 storage-only cabinets
cable routing, general, in, 4–4
configuration of, 4–1
power configuration of, 4–4
SCSI–2 cable routing in, 4–4
shelf locations in, 4–1, 4–2
signal cable routing in, 4–4
TZLX-series tape drive locations in, 4–2
Shelf locations
in SH043 controller/storage cabinets, 5–1, 5–3
in SH043 storage-only cabinets, 4–1, 4–2
Shelf SCSI–2 cable selection and connection
in SH043 controller/storage cabinets, 5–5
in SH043 storage-only cabinets, 4–4
Shelves, StorageWorks
installation of, 6–1, 6–3
Side panels
reinstalling, 6–9, 7–14
removal, 7–2
removing, 6–2, 7–3
Signal cable routing
in SH043 storage-only cabinets, 4–4
Site preparation, 2–1
Specifications
environmental stabilization, A–1
SH043 cabinet, 1–1
Stabilization, thermal, 3–1
T
Thermal stabilization, A–1
Trim kit, installing, 3–7
TZLX-series tape drives
chassis rail, 7–1
chassis rail installation, 7–4
installation of, 7–1
locations in SH043 controller/storage cabinets,
5–3
locations in SH043 storage-only cabinets, 4–2
power cord installation, 7–12
SCSI–2 signal cabling, 7–13
tape bezel, 7–1
tape bezel kit installation, 7–13
tape drive enclosure mounting, 7–9
U
Unloading, cabinet, 3–3
Unpacking, cabinet, 3–1
Index–2