Index
A
Air separation panels, 1–10, 6–1
in SH043 controller/storage cabinets, 5–4
in SH043 storage-only cabinets, 4–3
installation, 6–7
C
Cabinet
cooling, 1–10
inspecting, 3–8
leveling, 3–5, 3–7
placement of, 3–6
powering, 3–9
ramp unloading procedures, 3–3
site preparation, 2–1
unloading, 3–3
unpacking, 3–1
Cabinet components, 1–4
cabinet, 1–4
CDUs, 1–4
controller shelves, 1–4
SBB shelves, 1–4
SBBs, 1–4
shelf brackets, 1–4
TZLX-series tape drives, 1–6
Cable distribution units
power cables used, 8–1
type used, 8–1
Cable routing, general
in SH043 controller/storage cabinets, 5–6
in SH043 storage-only cabinets, 4–4
Cooling, cabinet, 1–10
D
Description, of SH043 cabinet, 1–1
Door locks, 6–2
E
Environmental stabilization, A–1
Exterior panels
reinstalling, 6–9, 7–14
removal, 6–2
F
Filler panels, 1–10, 6–1
in SH043 controller/storage cabinets, 5–4
in SH043 storage-only cabinets, 4–3
installation, 6–6
G
Grounding, equipment, 2–2
H
Host SCSI–2 signal cable routing
in SH043 controller/storage cabinets, 5–4
I
Inspection
of cabinet installation, 3–8
of ramps, 3–3
of shipped equipment, 3–1
Installing
base trim kit, 3–7
StorageWorks shelves, 6–1
TZLX-series tape drives, 7–1
L
Leveling, cabinet, 3–7
O
Overview, 1–1
P
Placement, of cabinet, 3–6
Power configuration
of SH043 controller/storage cabinets, 5–4
of SH043 storage-only cabinets, 4–4
Power configurations, 1–7, 8–1
dual cabinet power configuration, 1–9, 8–3
dual shelf power configuration, 1–8, 8–2
single cabinet power configuration, 1–7, 8–2
Index–1