background image

StorageWorks

SH043-Series Cabinet
Installation and User’s Guide

Order Number: EK–SH043–IG. A01

This manual describes the concepts and procedures necessary to

install, configure, and use StorageWorks SH043-series cabinets. Both

mechanical cabinet configuration and power configuration are covered in

this manual. The configuration and connection of SCSI–2 signal busses

is covered in referenced StorageWorks documentation.

Digital Equipment Corporation
Maynard, Massachusetts

Содержание SH043 Series

Страница 1: ...cedures necessary to install configure and use StorageWorks SH043 series cabinets Both mechanical cabinet configuration and power configuration are covered in this manual The configuration and connect...

Страница 2: ...d States of America NOTE This equipment generates uses and may emit radio frequency energy The equipment has been type tested and found to comply with the limits for a Class A digital device persuant...

Страница 3: ...abinet 3 1 3 2 Removing the Cabinet from the Pallet 3 3 3 3 Configuring the Cabinet Rack Space 3 6 3 4 Placing the Cabinet 3 6 3 5 Leveling the Cabinet 3 7 3 6 Installing the Skirt Kit 3 7 3 7 Inspect...

Страница 4: ...he Front Air Separation Panel 6 7 6 5 2 Installing the Rear Air Separation Panel 6 7 6 6 Reinstalling Exterior Cabinet Panels 6 9 7 Installing TZLX Series Tape Drives 7 1 General Installation Consider...

Страница 5: ...cations 4 3 5 1 SH043 Controller Storage Cabinet Shelf Locations 5 2 5 2 SH043 Controller Storage Cabinet Shelf and Tape Drive Locations 5 3 6 1 Exterior Cabinet Panel Removal and Installation 6 2 6 2...

Страница 6: ...iv 4 Schallemissionswerte Vorl ufige Werteangaben nach ISO 9296 und ISO 7779 DIN EN27779 xv 1 1 SH043 Series Cabinet Specifications 1 3 5 1 SH043 Controller Storage Cabinet SCSI 2 Cable Lengths 5 5 6...

Страница 7: ...by qualified service personnel Model Numbers Some equipment model numbers used in this manual are equivalent to those of other StorageWorks equipment Table 1 contains equivalent StorageWorks model num...

Страница 8: ...fines the acronyms and specialized terms used in this document Index The Index provides a cross reference to subject matter in this document Related Documents Table 2 lists the StorageWorks related us...

Страница 9: ...3 UG StorageWorks Metric Shelf Bracket Kit Installation Guide EK 35XRD IG StorageWorks RETMA Shelf Rail Kit Installation Guide EK 35XRB IG StorageWorks SH043 Series Cabinet Installation and User s Gui...

Страница 10: ...n Sheet EK RZ2XD UG SCSI Signal Converter DWZZA AA EK DWZZA SV SCSI Signal Converter DWZZA MA EK DWZZM SV SCSI Signal Converter DWZZA VA EK DWZAA SV TLZ06 Cassette Tape Drive Installation Guide EK STE...

Страница 11: ...his manual boldface type Boldface type indicates the first instance of terms being defined in text in the glossary or both italic type Italic type indicates emphasis and complete manual titles In the...

Страница 12: ......

Страница 13: ...Benutzer f r entsprechende Gegenma nahmen verantwortlich sind ATTENTION Ceci est un produit de Classe A Dans un environment domestique ce produit risque de cr er des interf rences radi lectriques il...

Страница 14: ...lves each containing 2 HSJ40 controllers and 8 SHDZZ ZZ shelves each containing 6 SHZBZ ZZ disk drives 7 0 7 0 50 0 51 0 Per device when installed in SH043 SHDZZ ZZ shelf containing 6 SHZBZ ZZ disk dr...

Страница 15: ...6 SHZBZ ZZ disk drives 5 7 5 7 39 39 BA350 MA shelf mit 2 HSJ40 controllers 5 6 5 6 39 39 Schalleistungspegel B Schalldruckpegel dBA Bediener Position Ger t Leerlauf Betrieb Leerlauf Betrieb nur SH04...

Страница 16: ......

Страница 17: ...accommodate both data storage and controller data storage combinations The cabinet and its StorageWorks shelves can be configured with dual ac power capability for power redundancy SH043 series cabine...

Страница 18: ...Figure 1 1 SH043 Series Cabinet CXO 3897A MC 1 2 Introduction...

Страница 19: ...1 8 C for each 1000 m altitude 1 0 F for each 1000 ft altitude Humidity 10 to 85 percent at maximum wet bulb temperature of 32 C 90 F and minimum dew point of 2 C 36 F Recommended Environmental Limit...

Страница 20: ...The shelves are 445 mm 17 5 inch in width and are designed to slide into the shelf brackets SBBs StorageWorks building blocks SBBs are modular computer peripheral devices or power units from the Stor...

Страница 21: ...Figure 1 2 Cabinet Major Components SBB SHELF SHELF BRACKET SBB CONTROLLER SHELF CDU INSTALLED IN REAR CXO 3896A MC CABINET Introduction 1 5...

Страница 22: ...s can be installed in the upper area of the cabinet as shown in Figure 1 3 A chassis rail is used to support the tape drive from one side Figure 1 3 TZLX Series Tape Drive CXO 3954A MC CABINET CHASSIS...

Страница 23: ...description of each configuration option follows 1 3 1 Single Cabinet Power Configuration In the single cabinet power configuration shown in Figure 1 4 a single ac power source and CDU A are used to...

Страница 24: ...e shelf remains powered by the other supply This configuration provides shelf power supply redundancy to the shelf s peripheral devices The cabinet supports a maximum of six shelves in the dual shelf...

Страница 25: ...mary power source CDU A or ac power supply A fails the shelf remains powered by ac power supply B This configuration provides complete power redundancy to the shelf s peripheral devices Figure 1 6 Dua...

Страница 26: ...tatus of the shelf blowers to be monitored by the host system Filler panels and air separation panels are used to properly route heated air through the cabinet Filler panels are flat plates that serve...

Страница 27: ...tacles are the correct versions for the power plugs provided with the cabinet The SH043 ZZ cabinet is supplied with a power cable that has an IEC 309 plug The site floor can safely bear the weight of...

Страница 28: ...nected to other equipment by one or more interface buses For both safety and reliable operation proper grounding is required between the cabinet and other equipment WARNING If enclosures are not conne...

Страница 29: ...following areas should be investigated Do all outlets have power ground connections Do the power cables on all equipment at the site have grounding prongs Are all power outlet neutral connections isol...

Страница 30: ......

Страница 31: ...when the unit is turned on Environmental stabilization begins when the equipment is placed in the room in which it is to be installed 1 Remove the cover the fasteners and the corrugated board from th...

Страница 32: ...ontainer Contents COVER FASTENERS SHIPPING STRAPS CARTON CONTAINING UNLOADING RAMPS MANUALS PALLET PLASTIC OR BARRIER BAG FASTENERS CORRUGATED BOARD CARTON CONTAINING SKIRT KIT CXO 3533A TI 3 2 Unpack...

Страница 33: ...the thickness of the ramp and greater than 50 percent of the ramp width Loose missing or broken ramp side rails Loose missing or bent metal hardware If any of these defects exist do not use the ramp...

Страница 34: ...Figure 3 2 Shipping Pallet Ramp Installation CXO 688D_S SHIPPING PALLET RIGHT RAMP ATTACHES HERE RIGHT UNLOADING RAMP EXTEND RAMP TO FULL LENGTH LEFT UNLOADING RAMP 3 4 Unpacking and Installation...

Страница 35: ...jury as a result of the cabinet tipping off the pallet or ramp 7 Loosen the leveler locking nuts and screw the four cabinet levelers all the way up into the cabinet WARNING Three people are required t...

Страница 36: ...led information and procedures regarding shelf bracket and shelf installation 3 4 Placing the Cabinet WARNING Use extreme caution when rolling the cabinet across the floor Failure to raise all leveler...

Страница 37: ...Installation of the skirt kit is optional Install the skirt kit around the base of the cabinet as follows 1 Unpack the skirt kit carton and use Figure 3 6 to identify the right left front and rear sk...

Страница 38: ...that the cabinet is level 3 Make sure that there are no obstructions to the airflow from the shelf blowers The side panels may need to be removed to check the shelf blowers 4 Check the identification...

Страница 39: ...indicators on each shelf power supply SBB are illuminated Refer to the StorageWorks Family User s Guide for further information on shelf status indicators WARNING Failure to reduce the leakage current...

Страница 40: ......

Страница 41: ...in down all disk drives and halt all tape drives in the cabinet Switch the circuit breaker on the front panel of the cabinet s cable distribution units CDUs to the OFF position 4 1 Cabinet Configurati...

Страница 42: ...S1 STORAGE POSITION S2 STORAGE POSITION S3 HOLE 2 HOLE 20 HOLE 26 HOLE 32 HOLE 14 HOLE 8 FRONT TO REAR SCSI 2 CABLE ROUTING POINTS HOLE 7 CDU A CDU B 4 1 2 TZLX Series Tape Drive Shelf Locations Figu...

Страница 43: ...and in accordance with the following guidelines Filler panels can be installed in empty shelf positions to control air flow and electromagnetic emissions and for the purpose of cosmetics Filler panel...

Страница 44: ...of each rear shelf along the rail SCSI 2 cables destined for front shelves are routed along the base pan and up the right hand vertical cabinet rail to a point just above the CDUs refer to Figures 4 1...

Страница 45: ...ghtly against the metal edges of the cabinet Signal cable bundling along the outside of the cabinet rails should be done to allow the doors to easily close Cables should be fastened along cabinet rail...

Страница 46: ......

Страница 47: ...ers and their installation WARNING While working in the cabinet interior ac power must be removed from cabinet components Failure to do so may result in personnel injury as a result of electric shock...

Страница 48: ...ket screw See Chapter 6 for detailed procedures pertaining to the mounting of StorageWorks shelves Note The SHxzz zz controller storage shelf consists of a controller shelf with an attached storage sh...

Страница 49: ...s on each side Note The SHxzz zz controller storage shelf consists of a controller shelf with an attached storage shelf In systems using SHxzz zz shelves and TZLX series tape drives storage positions...

Страница 50: ...r separation panels are supplied with each cabinet Install an air separation panel just above the upper most shelf in each side of the cabinet Air separation panels are not required above TZLX series...

Страница 51: ...other SCSI 2 cables connecting front shelves to rear shelves pass to the rear of the cabinet via the opening between the right hand shelf brackets at positions S4 and S9 refer to Figure 5 1 They pass...

Страница 52: ...and installed with the following rules in mind WARNING Cabinet rail edges may be sharp and can slice or abrade skin or cable insulation Cables should be routed in a manner that allows the shortest ove...

Страница 53: ...nce from the cabinet doors The same shelf bracket and stop bracket parts are used to mount all types of StorageWorks shelves in all locations The bracket set for shelves mounted in various positions i...

Страница 54: ...counterclockwise with a 5 32 inch hex wrench 6 2 1 Removing the Exterior Cabinet Panels As shown in Figure 6 1 there are two side panel hanger clips on each side of the cabinet A matching set of hang...

Страница 55: ...le insulation Note Two small ESD grounding posts are provided with the cabinet One is located on a front vertical cabinet rail and one on a rear rail Should an ESD grounding post interfere with the in...

Страница 56: ...ackets until it contacts the inner stop brackets The shelf should slide smoothly into the brackets If it binds remove it and check the alignment of the shelf brackets The shelf bracket mounting screws...

Страница 57: ...768A MC SHELF MOUNTING BRACKET LEFT FRONT POSITION STOP BRACKET FRONT VERTICAL CABINET RAIL STOP POSITION 1 STOP POSITION 2 STOP POSITION 3 STOP POSITION 4 STOP POSITION 5 FRONT SHELF LOCKING BRACKET...

Страница 58: ...tion Filler panels are attached to the cabinet with four screws and U nuts Install a filler panel in an unused shelf location as follows Place the filler panel against the cabinet rails in the shelf p...

Страница 59: ...st behind the front vertical cabinet rails as shown Position the panel as closely as possible to the top of the upper most front cabinet shelf 3 Fasten the air separation panel to the front vertical c...

Страница 60: ...ls as shown in Figure 6 6 2 Position the air separation panel against the front panel of CDU A or the four U nuts as shown in either Figure 6 5 or 6 6 respectively 3 Fasten the air separation panel al...

Страница 61: ...the entire surface of the side panel rests firmly against the side of the cabinet 3 Allow the panel to slide downward catching the two hanger clips as it moves 4 Install the side panel bolts into the...

Страница 62: ...catch your fingers between the cabinet and the top panel when snapping the panel to the cabinet 9 Lower the cover onto the cabinet and press it down ensuring that the pins snap into the top panel fas...

Страница 63: ...ting positions Only the orientation of the hardware differs between the two mounting positions There is no mechanical connection between two tape drives mounted side by side in the cabinet In situatio...

Страница 64: ...oving cabinet side panels To route the cabling in configurations where access to the interior of the cabinet is limited however cabinet side panels may need to be removed Sections 7 2 1 and 7 8 presen...

Страница 65: ...anel Remove the side panels as follows Figure 7 2 Cabinet Side Panel Removal and Installation LOWER SIDE PANEL HANGER CLIP SIDE PANEL TOP COVER M6x40mm BOLT 4 PLACES CXO 3899A MC SIDE PANEL HANGER CLI...

Страница 66: ...mponent assembly and installation procedures for both left and right tape drive mounting positions are presented in Sections 7 3 1 7 3 2 and 7 3 3 Note Two small ESD grounding posts are provided with...

Страница 67: ...n within the cabinet as follows see Figure 7 4 WARNING Cabinet rail edges may be sharp and can slice or abrade skin or cable insulation 1 Turn the cabinet power off as described in Section 7 1 2 Deter...

Страница 68: ...D STANDOFF 2 PLACES REAR CHASSIS RAIL LOCATING HOLE REAR VERTICAL CABINET RAIL U NUT 10 32 4 PLACES CXO 3924A MC U NUT 10 32 2 PLACES INNER FLANGE WARNING Use care in supporting the chassis rail assem...

Страница 69: ...marked in step 6 8 Reposition the chassis rail assembly as directed in steps 3 through 5 9 Fasten the chassis rail to the inner flanges of the front and rear vertical cabinet rails with four screws a...

Страница 70: ...BINET RAIL INNER FLANGE OUTER FLANGE FRONT CHASSIS RAIL LOCATING HOLE CXO 3923A MC REAR VERTICAL CABINET RAIL ROUND STANDOFF 2 PLACES RAIL BRACKET WASHER LOCK 10 32 INTERNAL 6 PLACES SCREW 10 32 HEX C...

Страница 71: ...hrough 5 9 Fasten the chassis rail assembly to the inner flanges of the front and rear vertical cabinet rails with four screws as shown 10 Fasten the rail bracket to the rear vertical cabinet rail wit...

Страница 72: ...EF LOCK DOWN BRACKET 01 SCREW 10 32 HEX CAP 4 PLACES WASHER 10 32 LOCK 4 PLACES TAPE DRIVE ENCLOSURE FRONT WASHER 10 32 LOCK 2 PLACES SCREW 10 32 HEX CAP 4 PLACES LOCK DOWN BRACKET 02 WASHER 10 32 FLA...

Страница 73: ...OCK 2 PLACES NOTE TAPE DRIVE INTERNAL COMPONENTS NOT SHOWN FOR CLARITY WARNING Use two persons to lift the TZLX series tape drive The unit is heavy and awkward to lift Failure to use two persons to li...

Страница 74: ...t vertical chassis rail with two hex cap screws as shown in Figure 7 6 or 7 7 7 5 Installing the Power Cord AC power for the TZLX series tape drive is obtained from CDU A Connect the female end of the...

Страница 75: ...talling the Cabinet Door Tape Bezel Kit To allow operator access to the TZLX tape drive the front cabinet door tape bezel kit must be installed To install the tape bezel kit see the Instructions for I...

Страница 76: ...nel 6 Locate the four inset nylon snap fasteners on the top cabinet rails WARNING The top cover is heavy and awkward to lift Installing it is a two person task Failure to use sufficient personnel may...

Страница 77: ...n the front panel of the cabinet s cable distribution units CDUs to the OFF position 8 2 Cable Distribution Units The 887 E CDU is used with SH043 series cabinets and is designed for both 230 volt 50...

Страница 78: ...onfiguration Unless options are specified SH043 series cabinets are shipped with a single CDU and single shelf power supplies For ease of upgrade the cabinet is supplied with 10 black and 10 gray prei...

Страница 79: ...U CDU B is installed immediately above CDU A in the rear of the cabinet Refer to the StorageWorks SH043 Series Data Center Cabinet Cable Distribution Unit Installation Guide for procedures pertaining...

Страница 80: ......

Страница 81: ...minutes 0 to 9 32 to 49 1 hour 10 to 1 14 to 31 2 hours 20 to 11 4 to 13 3 hours 30 to 21 22 to 5 4 hours 40 to 31 40 to 21 5 hours CAUTION Always stabilize storage devices in the operating environmen...

Страница 82: ......

Страница 83: ...f the SH043 series cabinet including the exterior panels and the doors This term may also be used to refer to an enclosure configured with internal storage components cable distribution unit See CDU C...

Страница 84: ...d installed in a 3 inch or 5 inch carrier Typical SBBs are disk drives tape drives optical storage devices and CD ROMs SBB shelf A StorageWorks shelf such as the SHDZZ ZZ designed to house plug in SBB...

Страница 85: ...and configure their own storage subsystems StorageWorks products consist of modular storage and power components and the enclosures necessary to house them Storage devices and array controllers can be...

Страница 86: ......

Страница 87: ...ion of SH043 cabinet 1 1 Door locks 6 2 E Environmental stabilization A 1 Exterior panels reinstalling 6 9 7 14 removal 6 2 F Filler panels 1 10 6 1 in SH043 controller storage cabinets 5 4 in SH043 s...

Страница 88: ...shelf locations in 4 1 4 2 signal cable routing in 4 4 TZLX series tape drive locations in 4 2 Shelf locations in SH043 controller storage cabinets 5 1 5 3 in SH043 storage only cabinets 4 1 4 2 Shelf...