Circuit Overloading
Consideration should be given to the connection of the DR365-HA™ appliance to the
power supply circuitry. The effect that any possible overloading of circuits might have on
overcurrent protection and power supply wiring should be considered.
Reliable Ground
A reliable ground must be maintained at all times. To ensure this, the rack itself should be
grounded. Particular attention should be given to power supply connections other than the
direct connections to the branch circuit (i.e. the use of power strips, etc.).
Removing the Protective Film
Before operating the StoneFly Storage Concentrators for the first time, it is important to
remove the protective film covering the top of the chassis, in order to allow for proper
ventilation and cooling.
1. Peel off the protective film covering the top cover and the top of the chassis.
2. Check that all ventilation openings on the top cover and the top of the chassis are clear
and unobstructed.
Identifying the Sections of the Rack Rails
You should have received two rack rail assemblies in the rack mounting kit. Each assem-
bly consists of two sections: 1) an inner fixed chassis rail that secures directly to the server
chassis, and 2) an outer fixed rack rail that secures directly to the rack itself. Two pairs of
short brackets to be used on the front side of the outer rails are also included.
Installing the Inner Rails
Both the left and right side inner rails have been pre-attached to the Storage Concentrator
chassis.
DR365-HA
Quick Start Guide
5
Содержание DR365-HA
Страница 1: ...Quick Start Guide STONEFLY DR365 HA Cluster High Availability HyperConverged Appliance...
Страница 15: ...DR365 HA Quick Start Guide 12 Figure 8 Storage Array Expansion Connection...
Страница 25: ...26250 Eden Landing Rd Hayward CA 94545 510 265 1122 support StoneFly com www StoneFly com...