![Draper 227025 Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/draper/227025/227025_instructions-installation-and-operation_2528596001.webp)
CAUTION
Read and understand all warnings
(Page 2 of
this document)
before beginning installation.
Components
Completed Assembly Drawing
1
2
3
4
4
5
5
6
6
7
7
8
8
9
9
1.
Brackets, Front Case
(Qty = 2)
2.
Bracket, Right Case Attachment
(Qty = 1)
3.
Bracket, Left Case Attachment
(Qty = 1)
4.
Screws, #10-32 x
1/2
"
(13mm)
Cross Head
Zinc Machine
(Qty=6)
5.
Screws, #10-32 x 1"
(25mm)
Long Cross Head
Zinc
(Qty=2)
6.
Brackets, Ceiling Mounting
(Qty = 2)
7.
Brackets, Sliding Wall
(Qty = 2)
8.
Nuts, .250-20 Nylon Inserted Hex Zinc Locking
(Qty = 4)
9.
Screws, .250-20 x
3/4
"
(19mm)
Cross Head Machine
(Qty=4)
Parts List
TOOLS
REQUIRED
POWER DRILL
PENCIL
TAPE MEASURE
HARDWARE
(by others)
LEVEL
Draper, Inc. | 411 S. Pearl St. Spiceland, IN 47385
draperinc.com | 765.987.7999 | 800.238.7999
© 2020 All Rights Reserved
|
FORM: FloatingMountingBracket_Inst20
Floating Mounting Bracket
For Targa, Premier, Premier C, Luma 2, and Luma 2 with AR projection screens
INSTRUCTIONS
INSTALLATION & OPERATION
If you have any difficulties installing or servicing your
Premier projection screen, call your dealer or Draper, Inc.