Commissioning Instructions I/O Terminal Module
2
WE KEEP THINGS MOVING
2.5
Commissioning, operation and service
Remove additional coverings before commissioning so that the device cannot overheat. During installation,
provide the free spaces specified in the projecting manuals to prevent the inverter from overheating.
The housing of the drive controller must be closed before you turn on the supply voltage. When the supply
voltage is on, dangerous voltages can be present on the connection terminals and the cables and motor
terminals connected to them. Remember that the device is not necessarily de-energized after all indicators
have gone off.
When network voltage is applied, the following are prohibited:
•
Opening the housing
•
Connecting or disconnecting the connection terminals
•
Installing accessories
Before carrying out any work on the machine, observe all the following five safety regulations in the above-
mentioned sequence:
1. Enable. Ensure that you also activate the auxiliary circuits.
2. Secure against switching on.
3. Ensure that the parts are de-energized.
4. Earth and short-circuit.
5. Cover or isolate any live neighboring parts.
You can then start your work on the drive controller. Repairs may only be performed by STÖBER
ANTRIEBSTECHNIK GmbH + Co. KG.
Send defective devices together with a fault description to:
STÖBER ANTRIEBSTECHNIK GmbH + Co. KG
Department VS-EL
Kieselbronner Str.12
75177 Pforzheim
GERMANY
2.6
Disposal
Please comply with the latest national and regional regulations! Dispose of the individual parts separately
depending on their nature and currently valid regulations such as, for example:
•
Electronic scrap (PCBs)
•
Plastic
•
Sheet metal
•
Copper
•
Aluminum
Information
Please note that the discharge time for the intermediate circuit
capacitors is 5 min. You can only ensure that the parts are de-
energized after this time.