Use
4
Putting Out of Commission and Storage
Recommissioning after storage
If the truck has been stored for more than
six months, it must be checked carefully
before being recommissioned. This check
is similar to the workplace accident prevention
inspection. It is therefore necessary to check
all points and systems that are important for
truck safety.
Carry out the following operations:
– Clean the truck thoroughly.
– Grease all hinges and joints.
– Check the condition and density of elec-
trolyte, and, if necessary, recharge the
battery.
– Check that there are no traces of conden-
sation water in the hydraulic oil. Drain if
necessary.
– Carry out the same maintenance work as
for the first time it was commissioned.
– Commission the truck.
– In particular, check the following during
start-up:
• traction, control and steering
• brakes (service brake and parking brake)
• lifting device
1170 801 15 09 [EN]
75
Содержание EXG-10
Страница 2: ......
Страница 7: ...1 Introduction ...
Страница 20: ...1 Introduction Environmental considerations 14 1170 801 15 09 EN ...
Страница 21: ...2 Safety ...
Страница 31: ...3 Overviews ...
Страница 39: ...4 Use ...
Страница 82: ...4 Use Putting Out of Commission and Storage 76 1170 801 15 09 EN ...
Страница 83: ...5 Maintenance ...
Страница 123: ...6 Technical data ...
Страница 124: ...6 Technical data Technical Data Sheet EXG 10 12 16 Technical Data Sheet EXG 10 12 16 118 1170 801 15 09 EN ...
Страница 128: ...6 Technical data Loads per axle SA Side Access Note Apron ISO 2B width 800 mm 122 1170 801 15 09 EN ...
Страница 135: ......
Страница 136: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 1170 801 15 09 EN ...
Страница 137: ...Original instructions Counterweight pallet stacker EXG 10 EXG 12 EXG 16 1217 1218 1219 1170 801 15 09 EN 07 2012 Annex ...
Страница 138: ......
Страница 139: ...7 Diagrams ...
Страница 146: ...7 Diagrams Electrical installation 140 1170 801 15 09 EN ...
Страница 148: ...7 Diagrams Electrical installation 142 1170 801 15 09 EN ...
Страница 150: ...7 Diagrams Electrical installation 144 1170 801 15 09 EN ...
Страница 151: ...Diagrams 7 Electrical installation Mast tilt option EXG10 EXG12 EXG16 1170 801 15 09 EN 145 ...
Страница 152: ...STILL GmbH Berzeliusstrasse 10 D 22113 Hamburg Ident no 1170 801 15 09 EN ...