Operating Manual
STI-2807 | STI-2818LP
19
In the case that the surface shows different characteristics, means different hardness or different
coating thicknesses, a uniform grinding result will be achieved by varying the speed of movement
over the surface.
6.2 Failure
Irrespective of the following information, the local safety regulations are valid in any case for
the operation of the machine.. Assure all turning machine parts have come to standstill before
inspection or maintenance work starts. Always arrange the Safety Off as described in Chapter 2.
6.3
Safety Switch Off
The machine must be set into its “Safety Off Position” before starting any kind of
maintenance or repair work.
See Chapter 2—Safety Instructions.
6.4 Restart
All persons in the proximity of the machine must wear safety glasses with lateral
protection as well as steel toes work boots and hearing protection. The operator is also
required to wear close-fitting protective clothing.
See Chapter 5—Initial Operation.
7.0 Maintenance
7.1 Recommendations
7.2 Maintenance and Inspection
7.3 Maintenance
7.4 Regular Wear Parts
7.5 Service Schedule - STI-2807
7.6 Service Schedule - STI-2818LP
7.1 Recommendations
Prior to any repair work on the machine and its drives, secure machine against uninten-
tional switch-on. Put the machine in Safety Off Position as described in chapter 2.
Failures due to inadequate or incorrect maintenance may generate very high repair costs and long
stoppage periods of the machine. Regular maintenance is essential. Safety and service life of the
machine depend, among other things, on proper maintenance.
The following table will show recommendations about time, inspection and maintenance for the
normal use of the machine. The time indications are based on uninterrupted operation. When the
indicated number of working hours is not achieved during the corresponding period, the period can
be extended. Due to different working conditions it cannot be foreseen how frequently inspections
for wear checks, inspection, maintenance and repair works ought to be carried out. Prepare a
suitable inspection schedule considering your own working conditions.