STI-2807 | STI-2818LP
Operating Manual
16
5.0 Starting the Machine
5.1 Preparing for Initial Operation
5.2 Initial operation - STI-2807
5.3 Initial operation - STI-2818LP
5.1
Preparing for Initial Operation
Before start up ensure all existing protective housings are fitted and the filter unit is connected
correctly.
All persons in the proximity of the machine must wear safety glasses with lateral
protection as well as safety shoes. The operator is required to wear close-fitting protective
clothing.
Carefully handle all plugs, cables, hoses, and operating devices. Avoid any contact with live wires.
Work on the electrical system has to be done only by qualified specialists.
Check the surface to be treated; it should be free of for loose parts (stones, screws, etc.). The
surface needs sweeping if necessary. Ensure that the machine can run over all inequalities on the
surface. Small inequalities like floor joints aren’t a barrier for the machine.
In order to avoid downtimes a regular inspection is essential. Carry out the
following checks before any start-up:
• Check whether all machine parts are assembled safely and correctly.
• Check all screws and other fasteners for tight seat.
• Check the tool holders to ensure that the proper tools are in place and secure.
• Check the tightness of the hose connections and the condition of the hose to the filter.
• Make sure the dust container of the filter unit is empty. Please comply with the local waste
treatment regulations considering the removed material.
• Check the electrical connections for dirt and foreign body deposits.
• Check the electrical motors for dirt and other contaminants.
Before start-up operators and other personnel must be familiar with the safety regulations
given in this manual.
1. Place the grinder in the area where work is to begin.
2. Place weights on grinding head beside motor.
3. Check the main power cable (STI-2807) and the dust hose for damage. Replace or repair all
damaged parts before starting the machine.
4. Connect the grinder and the filter unit with the dust hose.
5. Connect the supply cable of the P/M machine* with the site supply. Make sure that the correct
electric supply is available.