5
“
A
SSEMBLY
I
NSTRUCTIONS
”
Place all parts from the box in a cleared area and position them on the floor in front of you. Remove all packing
materials from your area and place them back into the box. Do not dispose of the packing materials until
assembly is completed. Read each step carefully before beginning.
S
TEP
1
–
Leveler Assembly
a.
Attach 4pcs
Levelers (28)
to the
Front Stabilizer
(2)
and the
Rear
Stabilizer (3.)
b.
Be sure to tighten the
Levelers (28)
securely against the
Stabilizers
(2, 3)
until screw lines are eliminated as the
drawing 1
shown.
S
TEP
2
–
Stabilizer Assembly
a. In order to assemble the
Stabilizer (2, 3)
smoothly, it is suggested to place one
Styrofoam (or any stationary object)
under one side of the
Main Frame (1)
that is going to assemble the stabilizer.
b. Attach the
Front Stabilizer (2)
and the
Rear Stabilizer (3)
onto the
Main Frame (1)
and secure with the
Washers (8x38x2.0t)(87),
the
Lock Washers (M8)(86)
and the
Bolts
(M8xp1.25x65mm)(112)
by using the socket wrench. NOTE: If the item is not level, review the
LEVELING NOTE
on
Detailed Lever- drawing 1
Detailed Lever- drawing 2
Adjustment Plate
Stabilizer
Leveler (28)
Screw line
Stabilizer
Adjustment Plate
Leveler (28)
LEVELING:
After placing the bike
in the intended location for use,
check the stability of the bike. If the
bike is not level, reviewing the
following direction:
Loosen the Leveler (28) to make
the Adjustment Plate become less
tight.
Adjust the Leveler (28) for leveling.
Tighten the Adjustment Plate
securely against the Stabilizer to
lock the Leveler (28) in stable
position as the drawing 2 shown.
Содержание PR-8223
Страница 29: ...28 PRODUCT PARTS DRAWING ...