6
the right side to level the
Levelers (28).
“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
3
–
Connection
Wire Assembly
a. Plug the
Middle Connection Wire (130)
into the
Lower Connection Wire (131).
Be careful not to pinch the wires.
b. Plug the
Pulse Sensor Wire 2 (134)
into the
Pulse Sensor Wire 3 (135).
Be careful not to pinch the wires.
S
TEP
4
–
Upright Post Assembly
a. Refer to
FIG. 1
, check that 2pcs
Nylock Nuts (M10)(126)
have pre-assembled into the front of the
Main Frame (1)
(they will not be tight so that slotted bracket of the upright post will slide between the nut and the frame).
b. Insert the
Upright Post (8)
into the
Main Frame (1)
and secure with 2pcs
Bolts (M10xp1.5x50mm)(117)
by using the
T-HEAD SOCKET WRENCH
as shown. Then fully tighten with 2pcs
Nylock Nuts (M10)(126).
S
TEP
5
–
Front Decoration Cover Assembly
Attach the
Front Decorative Cover (13)
onto the front of the
Main Frame (1)
with 2pcs
Bolts (M5xp0.8x30mm)(100).
S
TEP
6
–
Stationary Handlebar Assembly
NOTE:
For shipping purpose, 4pcs
Bolts (M8xp1.25x20mm)(104)
and 4pcs
Lock
Washers (86)
are attached on the
Stationary Handlebar (9)
.
a. Remove 4pcs
Bolts (M8xp1.25x20mm)(104)
and 4pcs
Lock Washers (86)
from
the
Stationary Handlebar (9)
.
b. Insert the
Stationary Handlebar (9)
into the
Upright Post (8)
and secure with 4pcs
Bolts (M8xp1.25x20mm)(104)
and 4pcs
Lock Washers (86)
.
NOTE: Do not
remove the Nuts
(126) during
assembly
Содержание PR-8223
Страница 29: ...28 PRODUCT PARTS DRAWING ...