21
Under normal conditions, the absence of oxygen minimises the risk of ignition in a
vacuum truck. However, operating rotary lobe blowers and vacuum pumps at high
speeds creates high air movement and high vacuum levels, resulting in high
discharge air temperatures and high discharge vapor concentrations that can present
potentially ignitable conditions.
10. ATMOSPHERIC TESTING
The areas where vacuum trucks will operate must be free of hydrocarbon vapors in
the flammable range.
*The areas where the vacuum truck operator and others work without respirators
must also be at or below air contaminants PELs/STELs. If there is any question
whether the area is vapor or toxic gas free, atmospheric testing shall be performed by
a qualified person using properly calibrated and adjusted detectors.
Testing shall be conducted prior to starting any operations, and if necessary
during operations, including, but not limited to the following:
•
When operations in the area are subject to change, such as automatic pump
start-up or product receipt into, or transfer out of a tank located near the
transfer operations.
•
When off-loading
•
When atmospheric conditions change, such as wind direction
•
When an emergency, such as product release, occurs within the facility that
may affect atmospheric conditions in the transfer area
To prevent exposure to toxic gases during transfer operations:
•
Never transfer fluids from one truck to another unless it has been established
that no chemical reaction will occur
•
Position trucks to minimise exposure to any discharged gases and fumes.
•
Ensure that discharge lines are long enough and large enough for safe
operation.
•
Position vent lines away from workers and workstations, including control
panels, valve handles, gauges, shut-offs, and hose attachment points – if
Содержание TANVAC HDV3000
Страница 2: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL TANVAC HDV3000 Sec on 1 ...
Страница 11: ...8 4 COMPONENT IDENTIFICATION Engine Control Panel Control Panel ...
Страница 14: ...11 Water System Water pump Switch Water Pump ...
Страница 15: ...12 Water Strainer Hose Reel ...
Страница 16: ...13 Water Tank Drain Valve Lever Vacuum System Dump valve Suction Valve ...
Страница 17: ...14 Blower Vacuum ...
Страница 19: ...16 Primary Shutoff Assembly Collection Tank Interior Bag House Lid ...
Страница 20: ...17 Bag House Drain Valve Tools Water Gun ...
Страница 34: ...31 20 3000lt ELECTRIC CONTROL BOX CIRCUIT DIAGRAM 1 ...
Страница 35: ...32 21 3000lt ELECTRIC CONTROL BOX CIRCUIT DIAGRAM 2 ...
Страница 36: ...33 22 3000lt VACUUM UNIT BOTTOM RAIL ASSEMBLE ...
Страница 37: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Cat 2 2 Opera on Manual Sec on 2 ...
Страница 137: ... Table 32 contd 100 SEBU8312 03 Reference Information Section Maintenance Log ...
Страница 141: ......
Страница 144: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Comet Manual Sec on 3 ...
Страница 161: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Sutorbilt R Series Sec on 4 ...
Страница 200: ...SB 7 632 Page 39 SECTION 8 PARTS LIST ...
Страница 202: ...SB 7 632 Page 41 ...
Страница 204: ...SB 7 632 Page 43 301GAE810 A Ref Drawing ...
Страница 206: ...SB 7 632 Page 45 ...
Страница 208: ...SB 7 632 Page 47 ...
Страница 210: ...SB 7 632 Page 49 303GAE810 A Ref Drawing ...
Страница 212: ...SB 7 632 Page 51 ...
Страница 214: ...SB 7 632 Page 53 ...
Страница 216: ...SB 7 632 Page 55 300GAE810 A Ref Drawing ...
Страница 218: ...SB 7 632 Page 57 ...
Страница 220: ...SB 7 632 Page 59 ...
Страница 222: ...SB 7 632 Page 61 302GAA810 A Ref Drawing ...
Страница 224: ...SB 7 623 Page 63 ...
Страница 226: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Sutorbilt P Series Sec on 5 ...
Страница 245: ...SB 7 622 Page 12 1 PIPE STEEL 2 SCH 80 2 MED CARBON STEEL 1 2 FIGURE 9 GEAR DRIVER SK2150 ...
Страница 258: ...SB 7 622 Page 25 SECTION 8 PARTS LIST 300GAF810 B Ref Drawing ...
Страница 260: ...SB 7 622 Page 27 300GAG810 A Ref Drawing ...
Страница 262: ...SB 7 622 Page 29 300GAH810 A Ref Drawing ...
Страница 265: ......
Страница 266: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Lofa Manual Sec on 6 ...
Страница 268: ...EP250 Panel Operation and Troubleshooting 2 463 3000 01 Rev D 23 Sep 2013 This page intentionally left blank ...
Страница 294: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Excava on Hydro SWMS Sec on 7 ...
Страница 314: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Pressure Cleaner Water SWMS Sec on 8 ...