If possible, install the blower in a well lit, clean, dry place
with plenty of room for inspection and maintenance.
FOUNDATIONS
For permanent installations we recommend concrete
foundations be provided, and the equipment should be
grouted to the concrete. It is necessary that a suitable
base be used, such as a steel combination base under
blower and motor, or a separate sole plate under each.
Before grouting, equipment must be leveled, free of all
strains, and anchored so no movement will occur
during setting of grout. After grout has completely
hardened, a recheck is necessary to compensate for
shrinkage, etc. If required, add shims under blower feet
after final tightening of foundation anchor bolts to
remove strain from the blower housing.
Where jack screws or wedges are used during
grouting, they must be backed off or removed before
final tightening of anchor bolts.
Where a concrete foundation is not feasible, care must
be taken to insure that equipment is firmly anchored to
adequate structural members.
MOUNTING CONFIGURATIONS
The blower flex--mount design enables horizontal and
vertical mounting configurations with top or bottom
hand, right or left hand shaft positioning. The units are
center timed allowing rotation in either direction (refer
to FIGURE 1). If converting a blower from vertical to
horizontal, or horizontal to vertical mounting configura-
tion, additional mounting feet will be required.
REPOSITIONING THE MOUNTING FEET
:
1.
Position the mounting feet to the desired location
and snug the capscrew.
2.
Place the blower on its feet on a flat surface.
3.
Loosen mounting feet capscrews and level unit
up. The bench or blower base flatness should be
within .002 of an inch.
If the unit is not flat within .002 of an
inch, it will be necessary to shim the
blower feet at installation.
FIGURE 1 -- BLOWER MOUNTING CONFIGURATIONS
Содержание TANVAC HDV3000
Страница 2: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL TANVAC HDV3000 Sec on 1 ...
Страница 11: ...8 4 COMPONENT IDENTIFICATION Engine Control Panel Control Panel ...
Страница 14: ...11 Water System Water pump Switch Water Pump ...
Страница 15: ...12 Water Strainer Hose Reel ...
Страница 16: ...13 Water Tank Drain Valve Lever Vacuum System Dump valve Suction Valve ...
Страница 17: ...14 Blower Vacuum ...
Страница 19: ...16 Primary Shutoff Assembly Collection Tank Interior Bag House Lid ...
Страница 20: ...17 Bag House Drain Valve Tools Water Gun ...
Страница 34: ...31 20 3000lt ELECTRIC CONTROL BOX CIRCUIT DIAGRAM 1 ...
Страница 35: ...32 21 3000lt ELECTRIC CONTROL BOX CIRCUIT DIAGRAM 2 ...
Страница 36: ...33 22 3000lt VACUUM UNIT BOTTOM RAIL ASSEMBLE ...
Страница 37: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Cat 2 2 Opera on Manual Sec on 2 ...
Страница 137: ... Table 32 contd 100 SEBU8312 03 Reference Information Section Maintenance Log ...
Страница 141: ......
Страница 144: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Comet Manual Sec on 3 ...
Страница 161: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Sutorbilt R Series Sec on 4 ...
Страница 200: ...SB 7 632 Page 39 SECTION 8 PARTS LIST ...
Страница 202: ...SB 7 632 Page 41 ...
Страница 204: ...SB 7 632 Page 43 301GAE810 A Ref Drawing ...
Страница 206: ...SB 7 632 Page 45 ...
Страница 208: ...SB 7 632 Page 47 ...
Страница 210: ...SB 7 632 Page 49 303GAE810 A Ref Drawing ...
Страница 212: ...SB 7 632 Page 51 ...
Страница 214: ...SB 7 632 Page 53 ...
Страница 216: ...SB 7 632 Page 55 300GAE810 A Ref Drawing ...
Страница 218: ...SB 7 632 Page 57 ...
Страница 220: ...SB 7 632 Page 59 ...
Страница 222: ...SB 7 632 Page 61 302GAA810 A Ref Drawing ...
Страница 224: ...SB 7 623 Page 63 ...
Страница 226: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Sutorbilt P Series Sec on 5 ...
Страница 245: ...SB 7 622 Page 12 1 PIPE STEEL 2 SCH 80 2 MED CARBON STEEL 1 2 FIGURE 9 GEAR DRIVER SK2150 ...
Страница 258: ...SB 7 622 Page 25 SECTION 8 PARTS LIST 300GAF810 B Ref Drawing ...
Страница 260: ...SB 7 622 Page 27 300GAG810 A Ref Drawing ...
Страница 262: ...SB 7 622 Page 29 300GAH810 A Ref Drawing ...
Страница 265: ......
Страница 266: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Lofa Manual Sec on 6 ...
Страница 268: ...EP250 Panel Operation and Troubleshooting 2 463 3000 01 Rev D 23 Sep 2013 This page intentionally left blank ...
Страница 294: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Excava on Hydro SWMS Sec on 7 ...
Страница 314: ...1300 998 784 STGGLOBAL NET OPERATORS MANUAL Pressure Cleaner Water SWMS Sec on 8 ...