Fuselage Construction Cont.
Fit left and right strut assemblies to slots in
main fuselage boom as shown. Tack with
medium CA glue.
Using a length of 0.045 in. wire, make a 90
degree bend 1/8 in. from one end. Cut wire
to length indicated on landing gear plan.
Do not bend other end at this point.
Cut two lengths of 1/16 in. heat shrink tubing
1-3/8 in. long to make axle spacers.
Install axle and seat in this order: Slide axle
through one wheel, then through left hub/strut
assembly.
Now, slide one spacer onto axle.
Next, slide seat onto axle.
Ensure seat is
facing forward!
eHopper
TM
© 2009 Stevens AeroModel all rights reserved.
Page 18 of 36