Page 7 of 18
939599301 Rev B
All electrical installations should
be done by a qualified person in
accordance with codes and
regulations applicable at the
installation site.
Connection of the building power to the Base
Power-In harness
1.
The electrician first locates the building interface and determines
the appropriate harness length. The electrician will cut the harness to
length leaving enough wire for the building interface.
2.
The electrician makes the wiring connections and secures a face
plate to the junction box.
3.
Do not proceed until the harness is disconnected from the power
module. The electrician makes the hardwired connections to the
building interface per the local electrical code, then checks the in-feed
harness for continuity. If the continuity is good, the electrician secures
a face plate to the junction box and connects the in-feed harness to
the power module.
4.
The electrician checks and confirms continuity at all outlets.
Building power
interface junction
box
Hardwire harness
NEUTRAL
GROUND
HOT2
HOT1
CIRCUIT 2
CIRCUIT 1
WIRING SCHEMATIC
WHITE, 12 GA
GREEN OR NO COATING, 12 GA
RED, 12 GA
BLACK, 12 GA
®
HEALTH