Page 12
PREPARATION
◊ gEnEral
Keep equipment clean at all times. Keep panel and
materials at room temperature.
High humidity environment might affect the adhesion.
Always apply sufficient contact pressure onto the
workpiece when edge-banding. Not enough pressure
might cause insufficient attachment on the workpiece.
Store hot melt adhesive in a cool and dry enclosed
place.
A filled glue pot is normally sufficient (depending on
glue) for gluing approximately 50m (height of tape
25 mm) or approximately 25m (height of tape 65 mm).
Always make sure the glue is melted in the glue pot
before operation.
Please use GL80 hot melt adhesive for edge-banding.
Hot melt glue brands such as Kleiberit VP929657,
Dorus KS224/2 or Jowat 280.30 , should be compatible
with the SCM 60-410. Please refer to glue performance
guide of each brand thoroughly.
The SCM 60-410 is suitable for edge-banding on
straight edges and on outside and inside curves. The
minimum inner radius for banding is 1’’ (25 mm) but
edge-banding thickness and type may affect the result.
◊ adding gluE
Check the glue level by looking through the window in
the glue pot cover.
Add glue pellets if necessary, before operation. The
glue pot is full when glue is within 10 mm (3/8’’) of
the top.
Warning: Wear gloves. glue pot cover may be very
hot. allow glue pot to cool before adding glue pellets.
◊ MEasuring and sETTing EdgE
band WidTH
The infeed guide is set to make sure the banding is
applied flush with the top of the piece.
The procedure is:
Loosen the tape insert guide knob
(fig. 1)
.
Place the edge band below the measuring wing and
lower the tape insert guide against the edge band, then
tighten the knob
(fig. 2)
.
(FIG.1)
(FIG.2)
Содержание 60-410
Страница 19: ...Page 19 CIRCUIT DIAGRAM...
Страница 20: ...Page 20 PARTS LIST...
Страница 24: ...Page 24 u NOTES u...