4
733.502 | 10.31
1 About this manual
1.1 Applicability
This manual describes the installation, commissioning, function, operation,
maintenance and dismantling of the inverter for grid-connected photovoltaic
systems.
When installing the remaining components, e.g. the photovoltaic modules, the
DC or AC wiring and other accessories, be sure to observe the appropriate instal-
lation instructions provided by each manufacturer.
StecaGrid 1900 Master-M: Master, Multi-Contact connectors (MC4, Sunline 2).
StecaGrid 1900 Slave-M: Slave, Multi-Contact connectors (MC4, Sunline 2).
1.2 Users
Installation, commissioning, operation, maintenance and deinstallation of the
inverter may only be done by trained personnel in accordance with the applicable
on-site installation regulations. The professional personnel must be familiar with this
operating manual and follow the instructions contained herein.
The end user may only perform operating functions.
1.3 Description of symbols
1.3.1 Structure of the warning notices
SIGNAL WORD
Type, source and consequences of the danger!
X
Measures for avoiding danger
1.3.2 Danger levels in warning notices
Danger level
Probability of occurrence
Consequences resulting from
non-compliance
DANGER
imminent threat of danger
death, serious bodily injury
WARNING
possible threat of danger
death, serious bodily injury
CAUTION
possible threat of danger
minor bodily injury
CAUTION
possible threat of danger
property damage
1.3.3 Notes
NOTE
Note on easier and safer working habits.
X
Measures for easier and safer working habits.
1.3.4 Other symbols and markings
Symbol
Meaning
X
call to action
result of action
-
action description
•
list
emphasis on issue at hand emphasis on issue at hand
EN
Содержание StecaGrid 1900 D Master
Страница 27: ...27 733 502 10 31...
Страница 53: ...53 733 502 10 31...
Страница 54: ...54 733 502 10 31 Certificates certificados...
Страница 55: ...55 733 502 10 31...
Страница 56: ...56 733 502 10 31 733502...