64
742.221 | 12.04
EN
2. If
SET
was pressed for a longer time then the inverter
restarts anew and synchronises itself with the grid.
8.8
Switching on the DC supply
Set the DC circuit breaker on the inverter to position
I
After testing via the internal MSD (approx. 2 minutes), the feed-in power can be shown on the
display (assuming that sunlight is present).
Fig. 8:
Set the DC circuit breaker on the inverter to position
I
Содержание coolcept StecaGrid 3000
Страница 127: ...125 742 221 12 04 Appendix Zertifikate Certificates Certificats...
Страница 128: ...126 742 221 12 04 Appendix...
Страница 129: ...127 742 221 12 04 Appendix...
Страница 130: ...128 742 221 12 04 Appendix...
Страница 131: ...129 742 221 12 04 Appendix...
Страница 132: ...742221...