I N S T A L L A T I O N
13
Clearances
Figure 6 – minimum clearances
Clearance guidelines
There is no minimum clearance on both side of the IER humidifier, but it is a good practice to
have a clearance of 4 to 8 in [100 to 200mm] for ease of installation and service
Allow a minimum clearance of 24in [610mm] with floor to allow for proper drain slope and
drain pipe column.
Front clearance of 30in [762mm] is required for access to the IER humidifier
Top clearance is required of 12in [304mm] for access and proper steam connection
Содержание IER-04 Series
Страница 2: ......