TABLE OF CONTENTS
I.
Plumbing Installation...............................................................................................................1
A. Plumbing Pre-Installation ..................................................................................................1
B. Plumbing Rough-In .............................................................................................................1
C. Steam Generator Plumbing Installation............................................................................2
Title Page
11.
Electrical Installation ...............................................................................................................2
A. Electrical Pre-Installation ...................................................................................................2
B. Electrical Rough-In .............................................................................................................2
C. Steam Generator Electrical Installation............................................................................2
III.
CP-1 Control Package Installation and Operation ................................................................4
A. Pre-Construction Considerations .......................................................................................4
B. CP-1 Control Package Rough-In ........................................................................................5
C. CP-1 Control Package Installation .....................................................................................5
D. Steam Solenoid Valve ...........................................................................................................6
E. Operation ..............................................................................................................................6
IV.
Auto Blowdown and Automatic ON/OFF Time Clock............................................................8
V.
Steam Generator Operation......................................................................................................8
VI.
Steam Generator Maintenance..................................................................................................8
A. Manual Blowdown ................................................................................................................8
B. Periodic Inspection ...............................................................................................................8
LIST OF ILLUSTRATIONS
1.
Dimensional Drawing for Heavy Commercial
Steam generator (HC-9 thru HC-18) ....................................................................................1
2.
Typical Steam generator Installation ........................................................................................3
3.
ST-200C Temperature Sensor Installation ...............................................................................4
4.
ST-200C Temperature Control Installation .............................................................................5
5.
System Control Module Installation .........................................................................................6
6. Installed CP-1 Control Package...............................................................................................7
7.
Automatic Blowdown and Automatic ON/OFF Time Clocks...... ............................................9
8.
“HC” Wiring Diagram with Option..........................................................................................11
IMPORTANT: Read all instructions before installing equipment
Steamaster Company Inc., 1998
Figure Page
System Control Module Installation
Содержание HC-10
Страница 1: ...HEAVY COMMERCIAL STEAMBATH GENERATOR OWNERS MANUAL Models HC 9 Thru HC 18 3 98 Pub No 400 G ...
Страница 12: ......
Страница 13: ......
Страница 14: ......