background image

SCH Hide-Away Storm Shelter™ Installation manual – REV 1 

 

Page 7 

 

Rear Wedge Anchors:

 

Push the shelter back a few inches till you see the front anchor sleeve’s and insert the hole 
plug’s, see illustration #1. These plugs prevent debris from getting in the insert when shelter is 
not in use. These plugs need to be removed before shelter is deployed for use. 

 

 

 

 

 

Ceiling 

Install the center ceiling panel using the slide guide rods & nuts. Install the lever handle roller 
arm assembly by attaching it to the shelter wall on each side. Attached the upper lever handle 
to the lever arm roller assembly. 

                                                 

  

Содержание Hide-Away Storm Shelter

Страница 1: ...ning safeguard children from playing on or with shelter when not in use Warning always lock down the front of the shelter with supplied floor anchors for storm use Warning any electrical supply to the...

Страница 2: ...rrier should you see any or suspect damage please file a claim immediately with the freight carrier Tools for installation Heavy lifting tools suggested Rolalift http www rolalift com products shtml W...

Страница 3: ...Shelter Confirm concrete surface is smooth and relatively level Be sure no off set bumps are in the area of the shelter 2 MOD Hide Away has 2 back wall sections 1 front wall section plus the door fram...

Страница 4: ...st door opening closing adjust door threshold so it clears floor by 1 8 and does not drag against the floor Test locking pins for ease of locking and unlocking see illustration 6 On Ballistic units te...

Страница 5: ...should be the same With the shelter open locate the back wall anchor locations and concrete anchors Drill the anchor bolt holes using a 5 8 Powers Bit concrete bit and hammer drill Use hearing protec...

Страница 6: ...drill Clean area after drilling to remove concrete dust and debris Remove the side wall braces push the shelter back a few inches till you see the front anchor holes insert the anchor sleeves only Use...

Страница 7: ...stration 1 These plugs prevent debris from getting in the insert when shelter is not in use These plugs need to be removed before shelter is deployed for use Ceiling Install the center ceiling panel u...

Страница 8: ...ws how to properly use the shelter Discuss with the customer to deploy the shelter in plenty of time when weather conditions are likely to produce severe storms or tornados For ballistic shelter use d...

Страница 9: ...SCH Hide Away Storm Shelter Installation manual REV 1 Page 9 6...

Страница 10: ...SCH Hide Away Storm Shelter Installation manual REV 1 Page 10 7 7...

Отзывы:

Похожие инструкции для Hide-Away Storm Shelter