SCH Hide-Away Storm Shelter™ Installation manual – REV 1
Page 6
With the shelter fully open and ALL of the side wall braces in place, illustration # 7, mark the
front anchor sleeve locations. Drill hole for front anchor sleeves using 1” concrete bit and
hammer drill. Clean area after drilling to remove concrete dust and debris.
Remove the side wall braces & push the shelter back a few inches till you see the front anchor
holes & insert the anchor sleeves only. Use a rubber mallet to gently tap into place, do not
damage the sleeve.
Pull the shelter forward and test the “T” handle front anchors see illustration # 43 on exploded
view. Fold & unfold the shelter and test “T” handle alignment several times. Front Dropin
Anchors: