STATUS SCIENTIFIC CONTROLS
Installation, Commissioning & Routine Gas Testing
FGD10B Pellistor Gas Detector
TD18/008
Issue:
10
Change Note:
1904
Page 35
Step 3
Remove the main PCB and unplug the pellistor sensor board.
Step 4
Remove sensor insert using extraction tool