Page 11 of 54
2.2 –Instrument frontal view
2.3 – Programming guide
To programme the product to accept different sensor types,
please see the sections below. To save time we have
marked paragraphs as obligatory (
O
), recommendable (
R
)
or optional (
op
).
As Process indicator:
1.
Input Configuration (Sec. 3.1) (
O
).
2.
Input Connection (Sec. 3.1.1/2 & 3) (
O
).
3.
Display Configuration (Sec. 4) (
O
).
4.
Program remote inputs (Sec. 5.2) (
R
).
5.
Install and configure output option(s) (Sec. 7) (
op
)
6.
Programming lock-out (Sec. 6) (
R
).
As thermometer Pt100:
1.
Input Configuration (Sec. 3.3) (
O
).
2.
Input Connection (Sec. 3.3.1) (
O
).
3.
Program remote inputs (Sec. 5.2) (
R
).
4.
Install and configure output option(s) (Sec. 7) (
op
).
5.
Programming lock-out (Sec. 6) (
R
).
As Load cell indicator
1.
Input Configuration (Sec. 3.2) (
O
).
2.
Input Connection (Sec. 3.2.1) (
O)
.
3.
Display Configuration (Sec. 4) (
O
).
4.
Program remote inputs (Sec. 5.2) (
R
).
5.
Install and configure output option(s) (Sec. 7) (
op
).
6.
Programming lock-out (Sec. 6) (
R
).