SE-704 Earth-Leakage Monitor 

Rev. 0 

 

 

Pub. SE-704-M, January 18, 2008. 

8.  P

ERFORMANCE 

T

EST 

 Some jurisdictions require periodic earth-fault 
performance tests.  A test record form is provided for 
recording the date and the result of the performance 
tests.  The following earth-fault system tests are to be 
conducted by qualified personnel. 
a) Evaluate the interconnected system in accordance 

with the overall equipment manufacturer’s detailed 
instructions. 

b) Verify proper location of the SE-CS30 current 

sensor.  Ensure the cables pass through the current-
sensor window.  This check can be done visually 
with knowledge of the circuit.  The connection of the 
current-sensor secondary to the SE-704 is not polarity 
sensitive. 

c)  Verify that the system is correctly earthed and that 

alternate earth paths do not exist that bypass the 
current sensor.  High-voltage testers and resistance 
bridges can be used to determine the existence of 
alternate earth paths. 

d) Verify proper reaction of the circuit-interrupting 

device in response to a simulated or controlled earth-
fault current.  To simulate earth-fault current, use CT-
primary current injection.  Fig. 7 shows a test circuit 
using a Startco SE-400 Ground-Fault-Relay Test 
Unit.  The SE-400 has a programmable output of 0.5 
to 9.9 A for a duration of 0.1 to 9.9 seconds.  Fig. 7 
shows the use of resistors that reduce the injected 
current to 10% of the SE-400 setting.  Set the test 
current to 120% of the SE-704 setting.  Inject the test 
current through the current-sensor window for at 
least 2.5 seconds.  Verify that the circuit under test 
has reacted properly.  Correct any problems and re-
test until the proper reaction is verified. 

e) Record the date and the results of the test on the 

attached test-record form. 

 

NOTE:

  Do not inject test current directly into current-

sensor-input terminals 4 and 5. 
 

SE-400

SE-704

RMT1

REMOTE

TEST

9

8

1

5

3

11

12

RMT2

L

L

N

N

L1

L1

OP1

OP2

L2

L2/N

FROM

POWER

SOURCE

LOAD

S1 S2

4 5

SE-CS30

11

10

R1

R2

R1 = 10 , 10 W, 1%

R2 = 0.1 , 10 W, 1%

I

= 1/10 SE-400 SETTING

W

W

TEST

I

TEST

 

FIGURE 7.  Earth-Fault-Test Circuit. 
 
 

TABLE 2.  E

ARTH-

F

AULT-

T

EST 

R

ECORD 

D

ATE

 

T

EST 

R

ESULTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Retain this record for the authority having jurisdiction. 

Содержание SE-704

Страница 1: ...MONITOR PWR CT TRIP TEST RESET TIME ms 30 400 55 100 200 300 500 600 800 1000 10 LEVEL mA 150 30 60 80 200 300 400 500 100 STARTCO E N G I N E E R I N G L T D Copyright 2008 by Startco Engineering Ltd...

Страница 2: ...This page intentionally left blank...

Страница 3: ...Analog Output 3 2 5 Self Diagnostics 3 3 Installation 3 4 SE 704 Compatibility 4 5 Technical Specifications 9 6 Ordering Information 10 7 Warranty 10 8 Performance Test 11 LIST OF FIGURES PAGE 1 SE 70...

Страница 4: ...Startco Engineering Ltd Page ii SE 704 Earth Leakage Monitor Rev 0 Pub SE 704 M January 18 2008 This page intentionally left blank...

Страница 5: ...levels to be used by rejecting harmonics that can cause nuisance tripping The VARIABLE FREQUENCY setting uses a peak detection algorithm with a wider band width for fault detection in variable freque...

Страница 6: ...9 2 41 2 95 0 27 MOUNTING DETAIL NOTE 2 0 34 TOP OFF ON FIXED FREQUENCY VARIABLE FREQUENCY FAIL SAFE LATCHING NON FAIL SAFE AUTORESET 3 4 2 1 CONFIGURATION SWITCHES NOTES 1 DIMENSIONS IN MILLIMETRES...

Страница 7: ...cle supply voltage If the problem persists consult Startco 3 INSTALLATION This earth leakage monitoring system consists of an SE 704 earth leakage monitor and an SE CS30 current sensor connected as sh...

Страница 8: ...04 enclosure Both generations of SE 704 are compared in Table 1 The SE 704 was previously available with SE 704 01 120 Vac and SE 704 02 240 Vac control voltage options These have been discontinued An...

Страница 9: ...TING SCREWS M4 OR 8 32 68 0 26 0 52 5 5 0 5 0 68 0 34 0 26 5 25 0 58 0 17 0 26 5 72 0 110 0 MAX 52 5 42 6 2 68 1 02 2 07 0 20 0 20 2 68 1 34 1 04 0 98 2 28 0 67 1 04 2 83 0 43 2 07 1 68 M5 SCREWS TOP...

Страница 10: ...1 18 5 43 4 96 2 21 1 81 M5 SCREWS TOP MOUNTING DETAIL NOTE 3 FRONT SIDE 5 0 0 20 RECESSED FOR 8 mm HEX NUT 1 0 0 04 DEEP DETAIL A MOUNTING FOOT INSTALLATION TOOL NOTES 1 2 3 DIMENSIONS IN MILLIMETRES...

Страница 11: ...0 0 16 DIA 8 7 0 34 DIA 4 3 0 17 RAD 6 0 6 0 42 5 30 0 60 0 9 5 9 5 79 0 3 35 2 83 2 36 0 24 0 24 3 11 1 67 1 18 2 36 0 37 0 37 INSTALLATION INSTRUCTIONS NOTE PANEL CUTOUT DETAIL REMOVE BEZEL AND LAT...

Страница 12: ...LATCH MONITOR TO BRACKET INSERT BRACKET THROUGH FRONT OF PANEL CUTOUT AND SECURE WITH FLAT WASHERS AND LOCKNUTS PROVIDED CONNECTWIRINGTOTERMINALS ATTACH COVER USING THUMB SCREWS PROVIDED 1 2 3 4 1 DI...

Страница 13: ...ront Panel Switch and Remote N O Contact Functional Test Front Panel Switch Output Relay Contact Configuration Isolated N O and N C Operating Mode Fail Safe or Non Fail Safe CSA UL Rating 8 A Resistiv...

Страница 14: ...ORDERING INFORMATION SE 704 0 U Universal 120 240 Vac Vdc Supply D 12 24 Vdc Supply T 48 Vdc Supply 3 24 Vac Supply SE CS30 26 Current Sensor 26 0 mm 1 02 Window SE CS30 70 Current Sensor c w Flux Co...

Страница 15: ...f the circuit interrupting device in response to a simulated or controlled earth fault current To simulate earth fault current use CT primary current injection Fig 7 shows a test circuit using a Start...

Страница 16: ...Startco Engineering Ltd Page 12 SE 704 Earth Leakage Monitor Rev 0 Pub SE 704 M January 18 2008 This page intentionally left blank...

Отзывы: