Startco Engineering Ltd.
Page 7
SE-704 Earth-Leakage Monitor
Rev. 0
Pub. SE-704-M, January 18, 2008.
STARTCO
E N G I N E E R I N G L T D .
SE-704
EARTH LEAKAGE MONITOR
PWR
CT
TRIP
TEST
RESET
TIME (
)
ms
30
400
55
100
200
300
500
600
800
1000
10
LEVEL (mA)
150
30
60
80
200
300
400
500
100
85.0
85.0
42.5
(3.35)
(3.35)
(1.67)
FRONT VIEW
85.0
72.0
60.0
2.0 (0.08) RAD
MAXIMUM
ALTERNATE
CONFIGURATIONS
4.0 (0.16) DIA
8.7 (0.34) DIA
4.3 (0.17) RAD
6.0
6.0
42.5
30.0
60.0
9.5
9.5
79.0
(3.35)
(2.83)
(2.36)
(0.24)
(0.24)
(3.1
1)
(1.67)
(1.18)
(2.36)
(0.37)
(0.37)
INSTALLATION INSTRUCTIONS:
NOTE:
PANEL CUTOUT DETAIL
REMOVE BEZEL AND LATCH MONITOR TO
BRACKET.
INSERT BRACKET THROUGH FRONT OF PANEL
CUTOUT AND SECURE WITH FLAT WASHERS
AND LOCKNUTS PROVIDED.
CONNECT WIRING TO TERMINALS.
INSTALL BEZEL USING 6-32 x 0.31 SCREWS
PROVIDED.
1.
2.
3.
4.
1. DIMENSIONS IN MILLIMETRES (INCHES)
110.0
75.0
(4.33)
(2.95)
PANEL THICKNESS
1.6 (0.06) TO 4.8 (0.19)
SIDE VIEW
55 mm (2.2) WIDE
MONITOR
BRACKET
6-32
6-32
FIGURE 5. PMA-55 Panel-Mount Adapter.
Содержание SE-704
Страница 2: ...This page intentionally left blank...