Procedure
(continued)
Step
Action
6
Use the tool (item 7) to tighten part
(E)
of the gland until the item
(D)
is fixed
between items
(E)
and
(A)
.
The item
(D)
protects the gland against over-tightening.
After tightening, the item
(A)
ensures a complete water-proof protection.
7
Use the tool (item 1) to remove the cable holder screws from SM CIRIUS AO, as
shown below:
Содержание SM Cirius AO
Страница 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...
Страница 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...
Страница 6: ...SM Cirius AO Vertical view ...
Страница 24: ...Cabling implementation for traffic power ...
Страница 26: ...Cabling implementation for outband power ...
Страница 29: ...Cabling implementation for traffic outband power ...
Страница 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...
Страница 68: ...Procedure continued Step Action 4 Pass the optical cable through M25 gland components as shown below ...
Страница 69: ...Procedure continued Step Action 5 Connect the optical fiber cable to the SFP module as shown below ...
Страница 84: ... End of Document ...
Страница 85: ...Star Microwave Service Corporation 41458 Christy St Fremont CA 94538 Tel 1 510 498 7900 Fax 1 510 498 7901 ...