background image

 

 

 

Procedure 

 

For mechanical installation  of the PoE device, follow the steps below:

 

 

Step

 

Action

 

Use the tool (item 1) to remove the cover of PoE device.

 

 

 

Use tool (item 13 - fitted with a 5 mm drill bit) and according the 
points as shown below drill the holes in the wall surface. 
 

 

 

 

 

 

 

Содержание SM Cirius AO

Страница 1: ...SM Cirius AO Point to point microwave IP radio with POE Installation Manual ...

Страница 2: ...PREPARING SM CIRIUS AO GROUNDING CABLE 34 3 3 PREPARING S FTP CABLE 36 4 POE INSTALLATION 42 4 1 INSTALLING POE ONTO POLE 42 PREREQUISITES 42 4 2 INSTALLING POE ONTO WALL 47 5 CABLING INSTALLATION 49 5 1 POE CABLING INSTALLATION 49 5 1 1 INSTALLING GBE ELECTRICAL FOR TRAFFIC POWER 49 PREREQUISITES 49 5 2 INSTALLING FE FOR OUTBAND MANAGEMENT POWER 52 5 3 SM CIRIUS AO CABLING INSTALLATION 56 5 3 1 I...

Страница 3: ...7 2 APPENDIX B RMA RETURN MATERIAL AUTHORIZATION FORM 83 ...

Страница 4: ...sion solution It operates in 7 8 11 13 15 18 23 26 38 GHz frequency bands and modulations from 4QAM to 256 QAM SM Cirius AO is provided together with the PoE Power on Ethernet box PoE serves power and traffic feeding from the Local Traffic Equipment towards SM Cirius AO SM Cirius AO PoE ...

Страница 5: ...50 x 39 270 x 150 x 52 Weight kg 7 0 7 8 GHz 6 5 11 13 15 18 23 26 38 GHz 0 5 1 0 SM Cirius AO Horizontal view No Description 1 Cable Holder screws for fastening Ethernet Optical cables 2 Grounding 3 BNC receptacle for measuring RSSI value 4 Padlock hasp x 2 5 Clamps x 4 for mounting SM CIRIUS AO onto antenna NOTE SM Cirius AO receptacles are protected with a metallic cap as shown above ...

Страница 6: ...SM Cirius AO Vertical view ...

Страница 7: ... GbE electrical 100 1000 Mbps receptacle for SM Cirius AO interconnection 1 1 or 2 0 2 RJ 45 FE 10 100 Mbps receptacle for outband management power 1 3 RJ 45 GbE electrical 100 1000 Mbps receptacle for traffic inband management power 1 4 SFP GbE optical or electrical1000 Mbps receptacle for traffic inband management ...

Страница 8: ...utput power down 2 Status LED 3 DC input power receptacle 4 Cable s clamp 5 Top cover screws x6 6 Wall mounts holes x4 7 Pole mounts points x2 8 Terminal ring for grounding supplied with PoE device NOTE PoE device can be installed either indoor or outdoor ...

Страница 9: ...ons The product is designed to be transported and stored under the following conditions Temperature 40 C to 70 C according to ETSI EN 300 019 2 2 V2 1 2 Class 2 3 transportation 300 019 2 1 V2 1 2 Class 1 2 storage Relative Humidity 90 to 100 at 30 C condensation 93 at 30 C steady state NOTE The preceding values apply only when the product is in its package Operating temperature The product is des...

Страница 10: ...nt failure and or electrical shock Ens ure t hat the groundi ng system meas ures an appropri at e path resist ance as specified by local regulati ons Ens ure that an appropri at e groundi ng termi nal exists at t he proxi mity of each equipment installation position PLUGGING UNPLUGGING THE S FTP CABLE S OF SM Cirius AO Never pl ug i n or unpl ug t he S F TP c abl e s of S M Ci ri us A O when PoE b...

Страница 11: ... onnect t he power cabl e t o or from t he P oE box when the Local DC Power Supply Source is on There is risk of equipment failure Ens ure t he Loc al DC Power Supply S ourc e is off and t hen c onnect or disconnect the power cable to or from the PoE box LASER RADIATION SM Cirius AO when SFP is used is a CLASS 1 laser product ESD PROTECTION Always us e proper antist at ic prot ecti on i e groundi ...

Страница 12: ...plied with the product and is installer responsibility to be provided during installation Item Photo Description 1 Cross headed Philips screwdriver PH 2 2 Flat headed screwdrivers AZ 10 AZ 5 5 AZ 2 5 3 Torx Plus screwdriver 10IP 4 Blade 5 Set of Allen hexagonal keys 6 Cable cutter 7 Set of U type wrenches from 5 mm up to 29 mm ...

Страница 13: ...able 9 Crimping tool for 6 mm2 cable 10 Crimping tool for S FTP cable with RJ 45 jack 11 Hot air blower 12 Ethernet cable tester 12 Drilling machine with bits is required only for Mounting PoE onto wall using 5 mmbit Mounting PoE onto wall using 8mm bit ...

Страница 14: ... SM CIRIUS AO installation The quantity is per site and the configuration is 1 0 Overview SM CIRIUS AO Description Qty Details SM CIRIUS AO 1 Available in 7 8 11 13 15 18 23 26 38 GHz frequency bands PoE Package Overview PoE box includes the following PoE Device PoE Pole Mounting Kit M20 Cable Gland Cable Holder ...

Страница 15: ...Wood Plugs 5mm X 25mm C 1 Set of 4 x Wood Screws 4mm x 30mm PoE pole mounting kit Item Description Qty Details A Mounting Bracket 1 Stainless Mounting Bracket for attaching PoE onto pole B Hose Clamp 1 Metallic Band Hose Clamp W 14mm L 1000mm for mounting bracket onto pole C Clamp Screw 2 Metallic Screws for Hose Clamp pole ...

Страница 16: ...less G Tie wrap 12 Tie wraps for cable fastening onto stainless mounting bracket 3 5x200mm UV protected M20 Cable Gland Description Qty Details M20 Cable Gland 1 SM CIRIUS AO Cable Gland M20 with spacer for RJ 45 receptacles Cable Holder Description Qty Details Cable Holder 1 Cable holder for fastening S FTP Optical fiber cable s ...

Страница 17: ...hernet cabl Required pieces provided Connector for S FTP cable termination E Fiber Optic Cable 1 Fiber Optical Cable outdoor use DX MM 2xLC PC LC PC 100 meters DX MM 2xLC PC LC PC 150 meters DX MM 2xLC PC LC PC 200 meters F RSSI Cable for 1 RSSI Cable assemblyfor SM CIRIUS AO antenna alignment Male BNC to 2 x banana plugs 75Ω G Greasing Paste 1 Greasing paste for antenna Oring H Cable Tie Wraps 1 ...

Страница 18: ...g cable 1 x 2 m cable 16 mm2 stranded PVC green yellow 450 V B 1 x M8 Terminal ring C 1 x M5 Terminal ring D Set of 2 x Screws M8 x 25 2 x Nuts M8 2 x Washers M8 6 x Lockwashers M8 1 x Tie wrap E 1 x Heat shrinkable tube black d 9 5 mm 4 8 mm F 1 x Terminal pin AWG6 Non insulated ...

Страница 19: ...le optional equipments Item Photo Description Qty Details A Optical SFP 1 Single Multi mode of various specs distances B Crimping Tool Required number provided For S FTP Cable Termination with RJ 45 Plug C DIN Rail Mount Required number provided 230 VAC 48 VDC ...

Страница 20: ...s of the site LOS between the sites Rain zone Polarization of the antennas Height of all buildings at the installation premises Rooftop information height status access dimensions layout etc Information about pre existing indoor outdoor equipment Available mounting space on the buildings roofs to reserve for the installation of the outdoor equipment Site specific information Mechanical specificati...

Страница 21: ...This will provide protection against harmful lightning conditions Cable conduits Appropriate cable conduits should exist for the routing of installed cables Outdoor installation requirements The outdoor equipment inclusive of the radio transceiver s and antenna s should be mounted on a mast or on a tower The pole onto which the PoE will be mounted Should have up to 50 mm outer diameter for mountin...

Страница 22: ...the installation period Entrances must be large enough to enable the easy transportation of the new equipment The floor must be level smooth and able to bear the load of the equipment The roof must be engineered to bear the weight of the service personnel and the outdoor equipment Safety The equipment premises should be of restricted access Only trained authorized personnel should have access to t...

Страница 23: ...ion for Traffic FE Connection for Outband Power 29 2 2 1 GBE ELECTRICAL CONNECTION FOR TRAFFIC POWER Overview This paragraph shows how to implement the SM CIRIUS AO cabling for passing traffic inband management power The system occupies only one GbE electrical interface for passing traffic inband management power SM CIRIUS AO can be powered by PoE device It s mandatory to follow the instructions o...

Страница 24: ...Cabling implementation for traffic power ...

Страница 25: ... the S FTP cable length between SM CIRIUS AO up to network equipment should not exceed 100 m Due to Power limitation the S FTP cable length between SM CIRIUS AO up to PoE OUT receptacle should not exceed the following distances Num of S FTP Cables One Cable Two Cables Power in parallel Voltage supply at PoE input 40 5 to 60 V 40 5 to 60 V 45 5 to 60 V Freq Band 8 GHz 50 m 100 m 200 m Freq Band 11 ...

Страница 26: ...Cabling implementation for outband power ...

Страница 27: ...connect PoE grounding terminal ring with the grounding bar 5 Connection details Grounding cable used to interconnect SM CIRIUS AO grounding point with the grounding bar NOTE Due to Electrical ETH limitation the S FTP cable length between SM CIRIUS AO up to network equipment should not exceed 100 m Due to Power limitation the S FTP cable length between SM CIRIUS AO up to PoE OUT receptacle should n...

Страница 28: ...ing traffic inband outband power SM CIRIUS AO occupies two interfaces as follows One FE interface for passing outband management power One GbE optical SFP interface for passing traffic inband management SM CIRIUS AO can be powered by PoE device It s mandatory to follow the instructions of this manual for the construction of S FTP Power Grounding Cables ...

Страница 29: ...Cabling implementation for traffic outband power ...

Страница 30: ...n details Grounding cable used to interconnect SM CIRIUS AO grounding point with the grounding bar 6 7 Connection details Optical fiber cable used to interconnect SM CIRIUS AO interface 6 with network equipment 7 for passing traffic NOTE Due to Electrical ETH limitation the S FTP cable length between SM CIRIUS AO up to network equipment should not exceed 100 m Due to Power limitation the S FTP cab...

Страница 31: ...see list in chapter Installation Tools on page 12 Item 1 Item 4 Item 9 NOTE PoE Terminal Ring is including inside the device The terminal ring for termination to grounding bar is not supplied Materials See below the required materials for PoE grounding cable preparation installation see list in paragraph PoE device on page 12 Item A see list in paragraph Optional Cables Ancillaries on page 17 Item...

Страница 32: ...ding bar 3 Use the tool item 4 to strip each end of the cable to dimensions as shown below Step Action 4 Use the tool item 1 to unscrew the terminal ring as shown below Slide the terminal ring over the wires at one end of the grounding cable and crimp it using the tool item 9 as shown below ...

Страница 33: ...de the terminal ring over the wires at the second end of the grounding cable and crimp it using the tool item 9 as shown above Then screw the ring onto grounding bar 6 Use the tool item 1 to reinstall the cover of PoE device End of Procedure ...

Страница 34: ...ed tools for SM CIRIUS AO grounding cable installation see list in chapter Installation Tools on page 12 Item 4 Item 7 8mm Item 8 Item 11 Materials See below the required materials in details for SM CIRIUS AO grounding cable installation see in paragraph Optional Cables Ancillaries on page 17 Item K Part ID Description A Grounding Cable B M8 Terminal ring C M5 Terminal ring D 2 x Screws 2 x Nuts 2...

Страница 35: ...ted to grounding bar and crimp it using the tool item 8 4 Slide the heat shrinkable tube E over the cable Heat it over rear grounding ring body and down on to cable jacket using the tool item 11 The following picture shows the correct installation of the ring covered with tube 5 Repeat steps 2 and 3 for the other end of the cable that will be connected to SM CIRIUS AO using the M5 terminal ring C ...

Страница 36: ...ot exceed the following distances Num of S FTP Cables One Cable Two Cables Power in parallel Voltage supply at PoE input 40 5 to 60 V 40 5 to 60 V 45 5 to 60 V Freq Band 8 GHz 50 m 100 m 200 m Freq Band 11 GHz 75 m 150 m 200 m Freq Band 13 38 GHz 100 m 200 m Use only straight through Ethernet cables to connect PoE device to SM CIRIUS AO For Ethernet straight connection please follow the step 6 on ...

Страница 37: ...ge 12 Item 4 Item 6 Item 10 Item 12 Materials See below the required materials for S FTP cable preparation see list in paragraph Optional Cables Ancillaries on page 17 Item C Item D For item Dwe are using the terminology as shown below No Description 1 Strain Relief 2 Shield 3 Wire Holder Load Bar 4 Housing ...

Страница 38: ... 2 Fold the outside shield and drain wire back over the jacket 3 Trim the foil up to 2 mm max from the jacket end 4 Slide the plug shield over the cable jacket and cable shield taking care not to injure the cable shield Do not slide the plug shield past the folded back end of the cable shield 5 While firmly holding the cable jacket next to the stripped end untwist the pairs as much as possible ...

Страница 39: ...avoid twisting between pairs as much as possible 7 Hold firmly the positioned pairs and make a preliminary cut to the pairs using tool item 6 to help the insertion of the conductors into the wire holder The conductors are ready for insertion 8 Insert the conductors through the wire holder and slide it up to the jacket end ...

Страница 40: ...he wire holder into the housing making sure it arrives up to the end 12 Visually verify that all conductors are fully inserted into the housing with the ends of the conductors seated against the end of the housing cavity If not push the cable into the wire holder and check that the wire holder has latched into both sides of the plug housing Take care not to rotate the cable relative to the plug an...

Страница 41: ... of the step check the following to make sure proper termination of the cable No What to check 1 The shield must properly be seated against plug housing Detail The shield end must be against the raised edge of the housing 2 The crimped strain relief must be held firmly in place on the cable 3 All contacts should be visible from the front of housing 15 Trim away any braid foil and drain wire left e...

Страница 42: ... in chapter Installation Tools on page 12 Item 1 Item 2 AZ 5 5 Item 3 Item 6 Materials See below the required materials for mechanical installation of the PoE device onto pole see list in paragraph PoE device on page 15 Item A see list in paragraph PoE pole mounting kit on page 15 Items A up to G Procedure Step Action 1 Use the tool item 3 to mount the PoE device onto its bracket with the two scre...

Страница 43: ...2 Use the tool item 3 to mount the PoE device onto its bracket with the two screws on the back side of PoE 1 2 as shown below ...

Страница 44: ...t the grounding cable 1 and pass through three tie wraps 2 as shown below These tie wraps will be used for cables fastening NOTE The pole will prevent you from passing through the tiewraps This is the reason why you are prompted to do it now ...

Страница 45: ...Procedure continued Step Action 4 Cut the hose clamp to two symmetrical pieces 5 Prepare each piece of the hose clamp as shown below 6 Use the tool item 2 to mount the PoE device as shown below ...

Страница 46: ...Step Action 7 The following picture shows the correct installation of the PoE 8 Use the tool item 1 to reinstall the cover of PoE device 9 Connect the other end of the grounding cable to the grounding bar End of procedure ...

Страница 47: ...installation of the PoE device into wall see list in chapter Installation Tools on page 12 Item 1 Item 13 with drill bit 5 mm Materials See below the required materials for mechanical installation of the PoE device into wall see list in paragraph PoE device on page 15 Items A B C ...

Страница 48: ...ion of the PoE device follow the steps below Step Action 1 Use the tool item 1 to remove the cover of PoE device 2 Use tool item 13 fitted with a 5 mm drill bit and according the points as shown below drill the holes in the wall surface ...

Страница 49: ...ow the prerequisites before starting S FTP cable installation to PoE device PoE device should be grounded to the grounding bar Availability of 2 x S FTP Cables terminated to RJ 45 jack S FTP Cable length restrictions as follows o Due to Electrical ETH limitation the S FTP cable length between SM CIRIUS AO up to network equipment should not exceed 100 m O Due to Power limitation the S FTP cable len...

Страница 50: ...Tools See below the required tools for connecting Ethernet S FTP cables into PoE device for traffic inband management power see list in chapter Installation Tools on page 12 Item 1 ...

Страница 51: ...place as shown below No Connection Details 1 S FTPcable used to interconnect PoE Gbe IN receptacle with the network equipment for passing traffic 2 S FTPcable used to interconnect PoE Gbe OUT receptacle with SM CIRIUS AO receptacle for passing traffic inband management power 3 Grounding cable used to interconnect PoE terminal ring with the grounding bar 5 Use the tool item 1 to reinstall the cover...

Страница 52: ...ork equipment should not exceed 100 m o Due to Power limitation the S FTP cable length between SM CIRIUS AO up to PoE OUT receptacle should not exceed the following distances Num of S FTP Cables One Cable Two Cables Power in parallel Voltage supply at PoE input 40 5 to 60 V 40 5 to 60 V 45 5 to 60 V Freq Band 8 GHz 50 m 100 m 200 m Freq Band 11 GHz 75 m 150 m 200 m Freq Band 13 38 GHz 100 m 200 m ...

Страница 53: ...es in place as shown below No Connection Details 1 S FTPcable used to interconnect PoE NMS IN receptacle with the network equipment for passing outband management 2 S FTPcable used to interconnect PoE Gbe OUT receptacle with SM CIRIUS AO receptacle for passing traffic inband management power 3 Use the tool item 1 to reinstall the cover of PoE device 5 Use the tool item 1 to reinstall the cover of ...

Страница 54: ...isconnect the negative V pole of the power supply Before plugging or unplugging any cable into PoE device as well as into SM CIRIUS AO you must switch off the Local DC Power Source and set the circuit breaker to OFF ID Description 1 Power Cable 2 Single pole Circuit 3 Local DC Power Distributor _____________________________________ Tools See below the required tools for connecting the power cable ...

Страница 55: ...t strands well to facilitate their insertion into the receptacle of PoE device 6 Pass the cable through the tie wrap Use the tool item 1 to remove the clamp and insert the bare ends of the cable well into the corresponding positions of the receptacle as shown below Blue wire to INPUT Brownwire to INPUT 7 Use the tool item 2 to tighten the two screws on top of the receptacle to secure strands 8 Use...

Страница 56: ...pment should not exceed 100 m o Due to Power limitation the S FTP cable length between SM CIRIUS AO up to PoE OUT receptacle should not exceed the following distances Num of S FTP Cables One Cable Two Cables Power in parallel Voltage supply at PoE input 40 5 to 60 V 40 5 to 60 V 45 5 to 60 V Freq Band 8 GHz 50 m 100 m 200 m Freq Band 11 GHz 75 m 150 m 200 m Freq Band 13 38 GHz 100 m 200 m Tools Se...

Страница 57: ...nagement power see list in paragraphError Reference source not found on page Error Bookmark not defined see list in paragraphPoE Packageon page 14 M20 Cable Gland Cable holder The following table shows the M20 Cable gland components in details Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...

Страница 58: ...ool item 2 to remove the receptacle metallic cover from SM CIRIUS AO as shown below Keep it in place for maintenance reason 2 Use the tool item 8 to tighten item A of the gland into the GbE receptacle of SM CIRIUS AO as shown below 3 Pass the S FTP cable already terminated to RJ 45 jack through items B C D and E of the gland ...

Страница 59: ... Step Action 4 Plug the S FTP cable into SM CIRIUS AO RJ 45 receptacle the clip on the RJ 45 plug see arrow below should face up Then insert item C into item B 5 Insert item B into item A by aligning the designated points ...

Страница 60: ...of the gland until the item D is fixed between items E and A The item D protects the gland against over tightening After tightening the item A ensures a complete water proof protection 7 Use the tool item 1 to remove the cable holder screws from SM CIRIUS AO as shown below ...

Страница 61: ...ction 8 Attach the cable holder into SM CIRIUS AO and use the tool item 1 to screw the removal screws as shown below 9 Use a tie wrap for cable fastening onto cable holder For SM CIRIUS AO grounding see page 36 End of procedure ...

Страница 62: ...le Two Cables Power in parallel Voltage supply at PoE input 40 5 to 60 V 40 5 to 60 V 45 5 to 60 V Freq Band 8 GHz 50 m 100 m 200 m Freq Band 11 GHz 75 m 150 m 200 m Freq Band 13 38 GHz 100 m 200 m Tools See below the required tools for connecting Ethernet S FTP cables into SM CIRIUS for outband management power see list in chapter Installation Tools on page 12 Item 1 Item 2 AZ 2 5 Item 7 24 mm Ma...

Страница 63: ...Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...

Страница 64: ...tem 2 to remove the receptacle plastic cover from SM CIRIUS AO as shown below Keep it in place for maintenance reason 2 Follow the steps 2 up to 8 as described in paragraph Installing GbE Electrical for Traffic on page 59 3 Use tie wrap for cable fastening onto cable holder For SM CIRIUS AO grounding see page 36 End of procedure ...

Страница 65: ...er limitation the S FTP cable length between SM CIRIUS AO up to PoE OUT receptacle should not exceed the following distances Num of S FTP Cables One Cable Two Cables Power in parallel Voltage supply at PoE input 40 5 to 60 V 40 5 to 60 V 45 5 to 60 V Freq Band 8 GHz 50 m 100 m 200 m Freq Band 11 GHz 75 m 150 m 200 m Freq Band 13 38 GHz 100 m 200 m Tools See below the required tools for connecting ...

Страница 66: ...aph Error Reference source not found On page Error Bookmark not defined see list in paragraph Optional Cables Ancillaries page 17 Item J see list in paragraph Optional Equipment on page 19 Item A The following table shows the M25 Cable Gland J components in details Item Description A Thread adaptor B Cable holder C Seal 1 D Spacer ring E Cap ...

Страница 67: ...low the steps below Step Action 1 Use the tool item 2 AZ 10 to remove the receptacles metallic cover from SM CIRIUS AO as shown below Keep it in place for maintenance reason 2 Insert the SFP module into the SFP receptacle of SM CIRIUS AO 3 Remove the protection caps as shown below ...

Страница 68: ...Procedure continued Step Action 4 Pass the optical cable through M25 gland components as shown below ...

Страница 69: ...Procedure continued Step Action 5 Connect the optical fiber cable to the SFP module as shown below ...

Страница 70: ...item 7 to tighten the item A of the gland into the GbE receptacle of SM CIRIUS AO until ensures complete water tightness 7 Use the tool item 7 to tighten the item B of the gland into item A until the O ring of item B ensures complete water tightness ...

Страница 71: ...Procedure continued Step Action 8 Insert item C into item B by aligning the designated points After insertion the connection must shown as below 9 Insert item D of the gland into item C ...

Страница 72: ...e continued Step Action 10 Insert item E as shown below 11 Use the tool item 7 to screw item F into item B Tight until the item E is fixed between parts F B The item E protects the gland against over tightening ...

Страница 73: ...ve the receptacle metallic cover from SM CIRIUS AO as shown below For installing S FTP cable for outband management power See Installing FE for Outband Management Power on page 53 13 Use the tool item 1 to remove the cable holder screws from SM CIRIUS AO as shown below ...

Страница 74: ...ction 14 Attach the cable holder into SM CIRIUS AO and use the tool item 1 to screw the removal screws as shown below 15 Use tie wrap for cable fastening onto cable holder For SM CIRIUS AO grounding see page 36 End of procedure ...

Страница 75: ...S AO ONTO ANTENNA Tools See below the required tools for installing SM CIRIUS AO onto antenna see list in chapter Installation Tools on page 12 Item 5 2 5 mm Materials For the required materials see list in paragraph Error Reference source not found On page Error Bookmark not defined see list in paragraph Optional Cables Ancillaries page 17 Item G ...

Страница 76: ...l as described below a Using the tool item 1 loosen the four screws at the feeder of SM CIRIUS AO do not remove the screws b Turn the feeder clockwise c Tighten the four screws recommended tightening torque 0 8 Nm to 1 0 Nm 2 a Change antenna polarization to be the same with SM CIRIUS AO b Αpply the greasing paste on the antenna feeder O ring as shown below c Place the O ring on the antenna feeder...

Страница 77: ...Procedure continued Step Action 3 First close the two diagonal clamps and then the other two clamps to secure SM CIRIUS AO in place ...

Страница 78: ...nput Output 5 Transmit and Receive Data C Input Output 6 Transmit and Receive Data B Input Output 7 Transmit and Receive Data D Input Output 8 Transmit and Receive Data D Input Output 10 100 NMS PoE Scope For outband management traffic power connection Type RJ 45 Female 10 100 Base T electrical with auto MDI MDI X Pin out Pin Signal Description 1 Transmit Data Power Input Output 2 Transmit Data Po...

Страница 79: ...eceive Data A Power Input Output 3 Transmit and Receive Data B Power Input Output 4 Transmit and Receive Data C Power Input Output 5 Transmit and Receive Data C Power Input Output 6 Transmit and Receive Data B Power Input Output 7 Transmit and Receive Data D Power Input Output 8 Transmit and Receive Data D Power Input Output SFP Scope For GbE optical data traffic connection Type SFP cage 1000 Base...

Страница 80: ...ceive Data D Input Output 8 Transmit and Receive Data D Input Output Gbe OUT Scope For connection of GbE electrical data traffic in band management and PoE Power on Ethernet output Type RJ 45 Female 10 100 1000 Base T electrical Pin out Pin Signal Description 1 Transmit and Receive Data A Power Input Output 2 Transmit and Receive Data A Power Input Output 3 Transmit and Receive Data B Power Input ...

Страница 81: ...Data D Input Output 8 Transmit and Receive Data D Input Output NMS OUT Scope For connection of outband management and PoE Power on Ethernet output Type RJ 45 Female 10 100 Base T electrical Pin out Pin Signal Description 1 Transmit and Receive Data A Power Input Output 2 Transmit and Receive Data A Power Input Output 3 Transmit and Receive Data B Power Input Output 4 Transmit and Receive Data C Po...

Страница 82: ...r connection of 48 V dc power supply voltage Type Three poles power receptacle Pin out Pin Signal Description 1 Power Supply Return GND Input 2 48 V dc nominal 40 V dc to 60 V dc Input 3 Optionally Earth Ground Input ...

Страница 83: ...ption 1 2 3 4 5 6 7 8 9 10 Notes 1 For Return Category column please select from A Return of Defective Product B Return of Trial Sample or C Return of New and Unused Product 2 If A or C category of return product is chosen please give short description of the problem or reason for returning Transportation Information Location of Product Transportation Method Shipping Forwarder Note Location of Pro...

Страница 84: ... End of Document ...

Страница 85: ...Star Microwave Service Corporation 41458 Christy St Fremont CA 94538 Tel 1 510 498 7900 Fax 1 510 498 7901 ...

Отзывы: