Maintenance
Section 5
Page 7
MSD SABER SERIES SHEARS
Attachment Model _____________________Excavator Hour Meter________________________
Attachment Serial Number ______________________________ Date______________________
_______
1.
Inspect blades
_______ a. Rotate or replace upper cutting blades
_______ b. Rotate or replace Saber Tip, nose blade, and guide blade
_______ c. Measure blade gap, refer to manual for shimming procedure and tolerance range
_______
2.
Inspect slide screw and slide screw gaps, each side
_______ a. Check for slide screw wear, replace if necessary
_______ b. Measure slide screw gap, adjust if necessary
_______
3.
Inspect upper shear
_______ a. Build-up and hardsurface upper shear
_______
4.
Inspect lower shear
_______ a. Replace wear plates if necessary
_______
5.
Inspect hydraulic components
_______ a. Check split fl anges and fi ttings for looseness, tighten if necessary
_______ b. Check hoses for wear or cracking
If Rotator equipped:
_______
1.
Inspect all bolts connecting the turntable bearing to the upper head and shear
_______ a. Replace bolts if retorque is necessary
Inspected by: __________________________________________________________________________
IMPORTANT
It is recommended that the shear cylinder and swivel seals be replaced every 2,000 hours. Operating the
shear with worn-out seals will decrease shear performance and may cause internal damage to the cylinder.
It is recommended that this work by performed by an authorized Stanley LaBounty Dealer. The Nylock lock
ring must be replaced each time a new seal kit is installed.
It is recommended that the cylinder shear seals be replaced by an authorized Stanley LaBounty dealer. The
Nylock lock ring must be replaced each time the cylinder seals are installed.
NOTICE
80-HOUR INSPECTION CHECKLIST
Содержание MSD 1000
Страница 1: ...MSD Saber Series Shears Part Number 512141 Safety Operation Maintenance Manual...
Страница 6: ...TABLE OF CONTENTS...
Страница 20: ......
Страница 30: ...Page 10 Section 3 Installation MSD SABER SERIES SHEARS...
Страница 38: ...Page 8 Section 4 Operation MSD SABER SERIES SHEARS...
Страница 117: ...512141 ver 6 2012 The STANLEY and LABOUNTY names and logos are registered trademarks of Stanley Infrastructure Solutions...