5/16 Rev. B 57-02497
15
●
Connect correctly rated over current protection device in the service line to the service line J-
box on the condensing unit.
●
After routing condensate line from drain pan of evaporator coil, seal around all refrigeration,
electrical and drain lines with silicone or butyl caulking.
● Start compressor and allow to run at least 24 hours before placing product into the walk-in.
During the testing period you should:
●
Check the temperature holding range against the control setting.
●
On low temperature units, check the defrost control system to see that all ice is removed from
the coil during each defrosts cycle.
●
Perform checks of door operation and all other component operations.
These particular systems are pre-charged at the factory with proper refrigerant, but should be
operationally checked as per page 11, A.6 and A.7.
Содержание BCHX0050B
Страница 17: ...5 16 Rev B 57 02497 NOTE Sizes specified are for Type L copper tubing...
Страница 18: ...5 16 Rev B 57 02497 18 NOTE Sizes specified are for Type L copper tubing...
Страница 21: ...5 16 Rev B 57 02497 21...
Страница 40: ...5 16 Rev B 57 02497 40 UNIT BASE SPECIFICATIONS...
Страница 41: ...5 16 Rev B 57 02497 41 UNIT BASE SPECIFICATIONS CONT...
Страница 42: ...5 16 Rev B 57 02497 42 UNIT BASE SPECIFICATIONS CONT...