Parameterization and Commissioning
16
159896 / 914660310010
2018-09-06·BA00·III·en·0
4
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
Frequency Transmitter Field Circuit Ex i
Series 9146
8.3.3 Connection of Contacts
Circuitry for line fault detection if the contacts at the input are de-energized:
8.3.4 Connection of Supply
9
Parameterization and Commissioning
Before commissioning, ensure the following:
• Installation of the device according to regulations.
• Correct connection of the cables.
• No damage at the device and connection cables.
• Tight seat of the screws at the terminals.
Correct tightening torque: 0.5 to 0.6 Nm.
9.1
Replacement of the Device
• If replacing this with a device that has an identical design, readjust the DIP switch and
parameterise it using ISpac Wizard, if necessary.
9.2
Parameterizations
See manual 9146.
Schematic
15529E
Short-circuit detection:
1 k
O
in series
Open-circuit detection:
10 k
O
parallel
Carry out circuitry for line fault detection in the immediate proximity of the
contacts.
Type of supply
Connection
Direct supply of the device via 24 V connection
Green terminal "7+" and "9-"
Supply via pac-Bus
pac-Bus terminal "1+" and "2-"
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
1 k
10 k
Содержание 9146 Series
Страница 41: ......