Istruzioni Instructions Anleitungen Instrucciones Инструкция
11
Preliminary Checks
•
Make sure that the ground is ideal for holding the cement base, in which the foundation
plate will be mounted.
•
Make sure to foresee the passage of the cables as in the ideal set-up. The cable passage
is situated in a central position on the back of the barrier.
•
Make sure that there are no obstacles in the way of the arm’s radius that could stop it’s
movement.
Fixing of the foundation plate (Fig. 2)
The barrier can be positioned either to the right or to the left of the passage. Therefore, once
decided the correct position proceed to the following steps:
•
Prepare a cement base where you can insert the foundation plate with the relative rods.
•
Make sure that the plate is perfectly flat, that it’s surface is perfectly clean and that the
rods are precisely perpendicular to the ground.
Fixing the barrier
Fig. 2
•
Take the top cover off by unscrewing the screws (Fig. 3).
•
Open the barrier wings, position the barrier on the foundation plate making sure that the
lower holes correspond to the screwable rods and screw everything in place with the M10
nuts. (Fig.4).
Fig. 3
Fig. 4