Stageline SL100 2018 Скачать руководство пользователя страница 7

1. SL100_User’s Manual_2018

        

5

2.   Operation of the Hydraulic System

2.   Operation of the Hydraulic System

MAKE SURE YOU FULLY UNDERSTAND THIS SECTION BEFORE PROCEEDING WITH SETUP.

If your stage is equipped with both a gas engine and an electric motor, use one power unit at a time.

CAUTION

2.1  Gas Hydraulic Power Unit 

 

•  Remove the compartment cover.

 

•  Turn the engine on. Turn the choke on.

 

•  Pull on crank-cord handle or turn the electric starter key. 

 

•   Gradually turn the choke off. In cold weather, it may be necessary to keep the choke  

at mid-position for approximately three (3) to four (4) minutes to let the engine  
warm up. Then turn the choke off.

 

•  For winter use conditions, refer to the engine user manual. 

 

•   Do not leave the engine idling, as this will cause oil to foam in the tank. Keep the throttle  

slightly engaged.

 

•   The hydraulic system works best at different RPM for different operations. Adjust speed  

accordingly. Higher engine speeds will generate faster hydraulic movements.

2.2  Hydraulic Levers

 

•   Push on the switch valve knob located in the engine compartment to  

activate the hydraulic stabilizers. Pull on the knob to activate  
roof and floor panels and raise the roof.

 

•  Each stabilizer, floor and roof panel has its own control lever.

 

•   The roof is raised with two (2) levers, one for each column.  

co 

Both levers can be operated simultaneously with caution.

IMPORTANT Levers are spring-loaded.  
In case of problems, release levers.  
System will stop.

Sliding controls  

are located around  

the engine’s left side. 

Arrows point to  

the 

“On” position.

THROTTLE
CHOKE
GAS LINE

Front Stabilizer Levers

Содержание SL100 2018

Страница 1: ...SL100 2018 User s manual stageline 2018...

Страница 2: ...duction of this document including the plans and drawings found herein in whole or in part are strictly forbidden without the written authorization of Stageline Mobile Stage Inc Stageline products are...

Страница 3: ...Removal of Windwall 14 5 3 Damaged Components 15 5 4 Ground and Geographic Status 15 5 5 Trailer Center of Gravity 15 5 6 Parking Your Unit 15 5 7 Freight Capacity and Positioning 15 5 8 Wintertime 1...

Страница 4: ...ure designated components and structures When removing pins to set up it is recommended that you do not place them on the ground or in your pockets During setup the structure must be checked and doubl...

Страница 5: ...may require some adjustments maintenance or replacement parts Should you need technical assistance or parts please contact our Customer Service Department OUR TOLL FREE TECHNICAL SUPPORT LINE IS AVAI...

Страница 6: ...ndwall Vinyl Repair Sample 1 Level A tool box with spare pins and designated tools for general maintenance can be purchased from Stageline 1 3 Spare Parts and Supplied Tools 1 4 Registration Certifica...

Страница 7: ...er manual Do not leave the engine idling as this will cause oil to foam in the tank Keep the throttle slightly engaged The hydraulic system works best at different RPM for different operations Adjust...

Страница 8: ..._2017 SL100 Switch Valve Knob IMPORTANT Levers are spring loaded In case of problems release levers System will stop Rear Stabilizer Levers Downstage roof and floor panel and roof levers Upstage roof...

Страница 9: ...the setup CAUTION Place a rubber woodpad under each hydraulic stabilizer 4 Refer to Section 5 4 for additional information Start the engine and let it warm up Push the switch valve knob Lower all four...

Страница 10: ...e slowly lower the floor panels to working height Pulling the floor lever completely will cause the panel to lower rapidly CAUTION Release the floor legs from underneath the floor panel Continue lower...

Страница 11: ...four 4 corner posts to the roof brackets Join together both upstage and downstage corner posts using rubber straps to prevent dragging on the floor Start the engine Raise the roof panels to their maxi...

Страница 12: ...heir weight on the corner post pins Attach and tighten all hooks at the bottom of the windwall to the stage floor if applicable Refer to the Rigging Plan for lifting restrictions CAUTION 3 3 Final Sta...

Страница 13: ...lumns Remove the pins from the top sections of the front and rear telescopic columns Slide in the upstage and downstage corner posts Raise the roof panels slightly to disengage the cylinder locks if a...

Страница 14: ...oximately 6 15 cm at a time Hitch the trailer to the towing vehicle Connect lighting and braking power cord to the tractor Check and connect the emergency breakaway cable to the tractor refer to secti...

Страница 15: ...732 kg m To support this weight the stage must be in good condition and set up in accordance with the procedure found in this manual It is possible to raise the floor capacity of the stage Please cont...

Страница 16: ...fice a windwall than to risk damage to the equipment or injury to its personnel or the public The most probable scenario during a violent storm is that the windwall will be torn away This is why it is...

Страница 17: ...pacity If the stage is positioned on a slope or atop a hill make sure there is no risk of landslide It may be necessary to consult with geotechnical services 5 5 Trailer Center of Gravity A Stageline...

Страница 18: ...the stage is for the most part set on the axle Loading your stage efficiently will allow you to transport an impressive quantity of scenic accessories and equipment SL100 0 x D 100 0 0 25 x D 75 25 0...

Страница 19: ...uarantee a safe use of Stageline mobile stages during this season special measures described herein are mandatory and pertain to standard safety procedures The following restrictions apply 1 If instal...

Страница 20: ...to remain the same ballast weights must be added On any other surface type such as snow or ice ballast weights are mandatory Contact Stageline for details 7 If the stage is set up on a snow or ice co...

Страница 21: ...k electrical circuit supply Remove compartment cover for ventilation If motor casing is hot let motor cool down for 30 to 60 minutes Floor panel will not close Remove any component or accessory left o...

Страница 22: ...Cylinder pivot points pivot points Roof Cylinder pivot points Roof Cylinder Roof Panel Cylinder pivot points Floor Hinges Roof Hinges Floor Panel Cylinder pivot points Floor Panel Cylinder pivot poin...

Страница 23: ...lent Inspect hubs drums and bearings annually or every 19 000 km Replace grease Visual inspection of structure and welded points before each use Thorough annual inspection Test before each use Adjust...

Страница 24: ...lter Spark Plug Sediment Cup Fuel Line Check before each use Clean every 3 months 50 hrs or less Check before each use Change every 6 months 100 hrs or less Clean or change every 6 months 100 hrs or l...

Страница 25: ...the tow vehicle receptacle Test brakes with the brake controller When disconnecting the trailer from the tow vehicle make sure to replace the safety pin on the breakaway switch Failure to replace the...

Страница 26: ...discharge and the rate of charge Avoid over or undercharging the battery It is recommended to fully charge the battery once every month or two months to avoid complete drainage the battery will need...

Страница 27: ...1 SL100_User s Manual_2018 25 7 maintenance documents 7 5 Hydraulic Diagram 1600...

Страница 28: ...off the ground in a dry location Cover the trailer and gooseneck with a protective wax Remove the ratchet straps securing the roof panels Close the roof panels completely Grease the extremities of the...

Страница 29: ...re 2 and manually lower the gooseneck picture 3 8 1 2 Raising Gooseneck Lift the gooseneck and put the locking pin back in on the telescopic arm Install gooseneck head and insert both locking pins 8 2...

Страница 30: ...oftop banner that extends from one end of the roof panel to the other end The long version will allow a rooftop banner to be installed from one end of a side overhang beam to the other Both versions a...

Страница 31: ...secure 8 5 Lateral Banner Retaining Bars These are used to hold the bottom section of any lateral banner in place Slide the banner supports through the frontal skirting orifices and under the stage fl...

Страница 32: ...installation Slide the first set of the platforms into the brackets located along the stage sides To join two or more platforms together always use the side with the lip first to facilitate insertion...

Страница 33: ...der locks must be installed when downstage corner posts are not used They are not to be considered a complete substitute to the corner posts The rigging capacity of the downstage panel is notably redu...

Страница 34: ...al electrician 8 14 Quick Connect System This system will allow you to use an electrical power unit or to replace the gas hydraulic power unit installed on your Stageline SL 100 in case of failure A p...

Страница 35: ...nstallation Procedure Lower the front roof panel to a comfortable working height j Locate the second and fifth bottom V groove of the roof panel T2 truss and install plastic sliders Secure with a 2 pi...

Страница 36: ...ms must be opened pinned and secured before attempting to install line array supports CAUTION Line array supports are reversible and each one can be installed on either side of the stage Lay the line...

Страница 37: ...1 SL100_User s Manual_2018 35 operator s notes...

Страница 38: ...customer service toll free north america 1 800 26 stage 78243 europe 1 450 589 1063 stageline com I info stageline com...

Отзывы: